Project intelligenceTDLR TABS2022026374New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

SH 5

From: SH 121 To: N. of Collin County Outer Loop, Melissa, TX, 75454

Target date passed (Sep 2024)Review Complete

SH 5 is a new construction project at From: SH 121 To: N. of Collin County Outer Loop, Melissa, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Sep 2024 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $44.7M across about 157,757 sq ft.

Estimated project value
$44.7M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
157,757 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$283/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 8mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 17, 2022746 days across supplied datesSep 1, 2024

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    137 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    609 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About SH 5

TxDOT District: Dallas is reconstructing and widening State Highway 5 in Melissa, Texas, from SH 121 to north of the Collin County Outer Loop. The project, identified in TDLR filings as CSJ: 0047-04-031, involves converting a two-lane rural highway into a four-lane urban roadway. The estimated cost for this new construction work is $44,707,948, spanning approximately 157,757 square feet of project area.

Project Scope and Design

CivilTech Engineering, Inc. serves as the design firm of record for this infrastructure improvement. The scope specifically targets the widening and reconstruction of the highway segment within Collin County. This project utilizes public funds and is located on public land, qualifying it as a Federally funded roadway project. The registered square footage of 157,757 sq ft results in a computed cost of $283 per square foot, a figure that reflects the complexity of urban highway expansion compared to standard building projects.

Construction was scheduled to begin in January 2023, with a planned completion date of September 2024. TDLR completed the plan review process in August 2022. Despite the scheduled completion date having passed, the TDLR status remains Review Complete, and the agency has not yet recorded a final inspection. This indicates that the current state of the site is not confirmed in the public record as finished. The scheduled build window of 609 days is significantly longer than the county median of 212 days for new construction filings, reflecting the scale of the highway work.

Regional Context and Comparisons

The estimated cost of $44,707,948 places this project in the top quarter of estimated costs for new construction filings in Collin County, where the median is $800,000. The $283 per square foot cost is above the county median of $120 per square foot. CivilTech Engineering, Inc. has six other TDLR-registered projects totaling $128,281,588, including work in Anna and Conroe. TxDOT District: Dallas has six other registered projects totaling $60,982,724, with locations in Addison, Dallas, and Grand Prairie.

Other registered projects in the immediate area include the GTP Building A and GTP Building B new constructions, as well as the Shop at Avery Pointe renovation. The surrounding ZIP code 75454 has a population of approximately 20,137, with a median household income of $135,556. The median owner-occupied home value in this Census area is $421,700. Collin County’s unemployment rate was 4.6 percent in June 2026, a figure that is higher than a year earlier.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75454 (Melissa)

One email per change. Unsubscribe in one click. Privacy.

SH 5 is a New Construction project located at From: SH 121 To: N. of Collin County Outer Loop, Melissa, TX 75454 in Melissa, Texas. The project has an estimated value of $44.7M covering 157,757 sq ft. TxDOT District: Dallas is the property owner and CivilTech Engineering, Inc. is the design firm of record. The project was registered with TDLR on August 17, 2022.

Frequently Asked Questions

What is the current status of the SH 5 reconstruction in Melissa?

TDLR has not yet recorded a final inspection. While the scheduled completion date was September 2024, the public record does not confirm the site is finished.

Who is the owner and design firm for this project?

The owner of record is TxDOT District: Dallas. The design firm of record is CivilTech Engineering, Inc.

What is the estimated cost and size of the project?

The estimated cost is $44,707,948. The registered square footage is 157,757 sq ft, resulting in a computed cost of $283 per sq ft.

What specific work is being performed on State Highway 5?

The scope involves reconstructing and widening a two-lane rural highway to a four-lane urban highway from SH 121 to north of the Collin County Outer Loop.

Is the project funded by public sources?

Yes, the filing states the project involves public funds, public land, or is a Federally funded roadway project.

What is SH 5?

SH 5 is a new construction project at From: SH 121 To: N. of Collin County Outer Loop in Melissa, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Reconstruct and widen two lane rural highway to four lane urban.

Is SH 5 open in Melissa?

SH 5 was scheduled to finish construction in Sep 2024 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is SH 5 located?

SH 5 is located at From: SH 121 To: N. of Collin County Outer Loop, Melissa, TX, 75454, in Collin County.

Who is the owner or developer of SH 5?

TxDOT District: Dallas is the property owner/developer of record for SH 5, per its TDLR project registration.

Who is the architect or design firm for SH 5?

CivilTech Engineering, Inc. is the design firm of record for SH 5, according to its TDLR filing.

How much does SH 5 cost and how big is it?

SH 5 has an estimated construction value of $44.7M and approximately 157,757 square feet (about $283/sqft), based on its TDLR filing.

Scope of Work

Reconstruct and widen two lane rural highway to four lane urban.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

From: SH 121 To: N. of Collin County Outer Loop, Melissa, TX, 75454

Location by street address

Watch all construction in 75454 (Melissa)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.