Project intelligenceTDLR TABS2022027067Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

AMAT B30 Cleanroom Conversion - Phase 1 in Austin, TX

9700 US 290, Austin, TX, 78724

Construction complete · Mar 2023Project Closed

AMAT B30 Cleanroom Conversion - Phase 1 is a renovation/alteration project at 9700 US 290, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2023). The project has an estimated value of $6.0M across about 26,250 sq ft.

Estimated project value
$6.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
26,250 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$229/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
5 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 25, 2022217 days across supplied datesMar 30, 2023

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    74 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    143 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78724 (Austin)

One email per change. Unsubscribe in one click. Privacy.

AMAT B30 Cleanroom Conversion - Phase 1 is a Renovation/Alteration project located at 9700 US 290, Austin, TX 78724 in Austin, Texas. The project has an estimated value of $6.0M covering 26,250 sq ft. Applied Materials is the property owner and Fuse Architecture Studio is the design firm of record. The project was registered with TDLR on August 25, 2022.

Frequently Asked Questions

What is AMAT B30 Cleanroom Conversion - Phase 1?

AMAT B30 Cleanroom Conversion - Phase 1 is a renovation/alteration project at 9700 US 290 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Conversion of existing warehouse space into an ISO 7 (Class 10,000) cleanroom with a small ISO 6 (Class 1,000) cleanroom within it. Phase 1 will be separated from Phase 2 (design in progress) by a temporary cleanroom partition.

Is AMAT B30 Cleanroom Conversion - Phase 1 open in Austin?

Construction on AMAT B30 Cleanroom Conversion - Phase 1 is complete — TDLR records show the project passed its required accessibility inspection in Mar 2023. The building is finished and very likely open.

Where is AMAT B30 Cleanroom Conversion - Phase 1 located?

AMAT B30 Cleanroom Conversion - Phase 1 is located at 9700 US 290, Austin, TX, 78724, in Travis County.

Who is the owner or developer of AMAT B30 Cleanroom Conversion - Phase 1?

Applied Materials is the property owner/developer of record for AMAT B30 Cleanroom Conversion - Phase 1, per its TDLR project registration.

Who is the architect or design firm for AMAT B30 Cleanroom Conversion - Phase 1?

Fuse Architecture Studio is the design firm of record for AMAT B30 Cleanroom Conversion - Phase 1, according to its TDLR filing.

How much does AMAT B30 Cleanroom Conversion - Phase 1 cost and how big is it?

AMAT B30 Cleanroom Conversion - Phase 1 has an estimated construction value of $6.0M and approximately 26,250 square feet (about $229/sqft), based on its TDLR filing.

Scope of Work

Conversion of existing warehouse space into an ISO 7 (Class 10,000) cleanroom with a small ISO 6 (Class 1,000) cleanroom within it. Phase 1 will be separated from Phase 2 (design in progress) by a temporary cleanroom partition.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

9700 US 290, Austin, TX, 78724

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Related City Permits

Building permits found at or near this location

9700 STONELAKE BLVD

183 tunnel with 64 trench approx 7 deep through concrete to replace old cast iron piping under the property.

ActivePlumbing PermitRepairOct 2026
View Details
2026-141884 PP
PlumbPros
9700 CROTON CV

Replacement of an existing water heater 40 Gallon Nat Gas

ActivePlumbing PermitChange OutOct 2026
View Details
2026-139772 PP
Sweetwater Home Services
9700 E US 290 HWY SVRD WB

For OUTSIDE THE BUILDING UNDERGROUND WASTEWATER ONLY. Please link to the Parent Permit 2026-103893 BP. Thank you!

ActivePlumbing PermitPlumbing Utility ConnectionSep 2026
View Details
2026-122164 PP
Haegelin Wehmeyer Construction Ltd.
9700 E US 290 HWY SVRD WB BLDG 34

Interior remodel 2nd floor areas at existing manufacturing facility- Etch Paros

FinalPlumbing PermitRemodelSep 2026
View Details
2026-083217 PP
9700 TREE BEND DR

tank water heater being replaced with a tankless

FinalPlumbing PermitRepairSep 2026
View Details
2026-113106 PP
Cold Is On The Right

Watch all construction in 78724 (Austin)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.