Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
West Long Street Reconstruction
378 West Long St, Stephenville, TX, 76401
West Long Street Reconstruction is a new construction project at 378 West Long St, Stephenville, in Erath County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2025). The project has an estimated value of $500K across about 27,000 sq ft.
- Estimated project value
- $500K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 27,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $19/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2y 7mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
38 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
927 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Inspection Complete
Final inspection completed, awaiting project closure
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76401 (Stephenville)
One email per change. Unsubscribe in one click. Privacy.
West Long Street Reconstruction is a New Construction project located at 378 West Long St, Stephenville, TX 76401 in Stephenville, Texas. The project has an estimated value of $500K covering 27,000 sq ft. City of Stephenville is the property owner and Freese and Nichols is the design firm of record. The project was registered with TDLR on September 9, 2022.
Frequently Asked Questions
What is West Long Street Reconstruction?
West Long Street Reconstruction is a new construction project at 378 West Long St in Stephenville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 0.6 mile roadway reconstruction project. Project includes addition of ~27000 sf (total) of new sidewalk on both sides of the road along with multiple curb ramps, driveway replacements, and concrete steps at residences.
Is West Long Street Reconstruction open in Stephenville?
Construction on West Long Street Reconstruction is complete — TDLR records show the project passed its required accessibility inspection in May 2025. The building is finished and very likely open.
Where is West Long Street Reconstruction located?
West Long Street Reconstruction is located at 378 West Long St, Stephenville, TX, 76401, in Erath County.
Who is the owner or developer of West Long Street Reconstruction?
City of Stephenville is the property owner/developer of record for West Long Street Reconstruction, per its TDLR project registration.
Who is the architect or design firm for West Long Street Reconstruction?
Freese and Nichols is the design firm of record for West Long Street Reconstruction, according to its TDLR filing.
How much does West Long Street Reconstruction cost and how big is it?
West Long Street Reconstruction has an estimated construction value of $500K and approximately 27,000 square feet (about $19/sqft), based on its TDLR filing.
Scope of Work
0.6 mile roadway reconstruction project. Project includes addition of ~27000 sf (total) of new sidewalk on both sides of the road along with multiple curb ramps, driveway replacements, and concrete steps at residences.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
378 West Long St, Stephenville, TX, 76401
Related Projects
Same Owner
$13.9M totalWatch all construction in 76401 (Stephenville)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Stephenville?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.