Funding type
This project is privately funded, on private land for private use.
PNC Bank ADA Remediation Design - Spencer Highway in South Houston, TX
1218 Spencer Hwy, South Houston, TX, 77587
PNC Bank ADA Remediation Design - Spencer Highway is a renovation/alteration project at 1218 Spencer Hwy, South Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2022). The project has an estimated value of $135K across about 2,050 sq ft.
- Estimated project value
- $135K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 2,050 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $66/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
18 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
60 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77587 (South Houston)
One email per change. Unsubscribe in one click. Privacy.
PNC Bank ADA Remediation Design - Spencer Highway is a Renovation/Alteration project located at 1218 Spencer Hwy, South Houston, TX 77587 in South Houston, Texas. The project has an estimated value of $135K covering 2,050 sq ft. Laredo National Bank is the property owner and Michael Baker International is the design firm of record. The project was registered with TDLR on September 13, 2022.
Frequently Asked Questions
What is PNC Bank ADA Remediation Design - Spencer Highway?
PNC Bank ADA Remediation Design - Spencer Highway is a renovation/alteration project at 1218 Spencer Hwy in South Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The improvements intend to bring the facility exterior accessible parking/access aisle and accessible pedestrian paths into compliance with current ADA standards.
Is PNC Bank ADA Remediation Design - Spencer Highway open in South Houston?
Construction on PNC Bank ADA Remediation Design - Spencer Highway is complete — TDLR records show the project passed its required accessibility inspection in Nov 2022. The building is finished and very likely open.
Where is PNC Bank ADA Remediation Design - Spencer Highway located?
PNC Bank ADA Remediation Design - Spencer Highway is located at 1218 Spencer Hwy, South Houston, TX, 77587, in Harris County.
Who is the owner or developer of PNC Bank ADA Remediation Design - Spencer Highway?
Laredo National Bank is the property owner/developer of record for PNC Bank ADA Remediation Design - Spencer Highway, per its TDLR project registration.
Who is the architect or design firm for PNC Bank ADA Remediation Design - Spencer Highway?
Michael Baker International is the design firm of record for PNC Bank ADA Remediation Design - Spencer Highway, according to its TDLR filing.
How much does PNC Bank ADA Remediation Design - Spencer Highway cost and how big is it?
PNC Bank ADA Remediation Design - Spencer Highway has an estimated construction value of $135K and approximately 2,050 square feet (about $66/sqft), based on its TDLR filing.
Scope of Work
The improvements intend to bring the facility exterior accessible parking/access aisle and accessible pedestrian paths into compliance with current ADA standards.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1218 Spencer Hwy, South Houston, TX, 77587
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$375K totalWatch all construction in 77587 (South Houston)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in South Houston?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.