Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Metcalf Elementary School renovation in Houston, TX
6100 Quenston Blvd, Houston, TX, 77269
Metcalf Elementary School renovation is a additions to existing building project at 6100 Quenston Blvd, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2024). The project has an estimated value of $4.6M across about 96,675 sq ft.
- Estimated project value
- $4.6M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 96,675 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $48/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 7mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
109 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
576 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77269 (Houston)
One email per change. Unsubscribe in one click. Privacy.
Metcalf Elementary School renovation is a Additions to Existing Building project located at 6100 Quenston Blvd, Houston, TX 77269 in Houston, Texas. The project has an estimated value of $4.6M covering 96,675 sq ft. Cypress-Fairbanks ISD is the property owner and VLK Architects Inc is the design firm of record. The project was registered with TDLR on September 16, 2022.
Frequently Asked Questions
What is Metcalf Elementary School renovation?
Metcalf Elementary School renovation is a additions to existing building project at 6100 Quenston Blvd in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovate existing building for classroom segmentation to separate classrooms from corridors, harden main front desk, impact resistant glass at all high traffic areas, building addition to include 4 classrooms, mechanical space, storage, IDF
Is Metcalf Elementary School renovation open in Houston?
Construction on Metcalf Elementary School renovation is complete — TDLR records show the project passed its required accessibility inspection in Aug 2024. The building is finished and very likely open.
Where is Metcalf Elementary School renovation located?
Metcalf Elementary School renovation is located at 6100 Quenston Blvd, Houston, TX, 77269, in Harris County.
Who is the owner or developer of Metcalf Elementary School renovation?
Cypress-Fairbanks ISD is the property owner/developer of record for Metcalf Elementary School renovation, per its TDLR project registration.
Who is the architect or design firm for Metcalf Elementary School renovation?
VLK Architects Inc is the design firm of record for Metcalf Elementary School renovation, according to its TDLR filing.
How much does Metcalf Elementary School renovation cost and how big is it?
Metcalf Elementary School renovation has an estimated construction value of $4.6M and approximately 96,675 square feet (about $48/sqft), based on its TDLR filing.
Scope of Work
Renovate existing building for classroom segmentation to separate classrooms from corridors, harden main front desk, impact resistant glass at all high traffic areas, building addition to include 4 classrooms, mechanical space, storage, IDF
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
6100 Quenston Blvd, Houston, TX, 77269
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$1.76B totalSame Design Firm
$16.78B totalWatch all construction in 77269 (Houston)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Houston?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.