Project intelligenceTDLR TABS2023003975New Construction
Funding type

This project is privately funded, on private land for private use.

Massey Oaks Phase 1B in Pearland, TX

4825 Massey Oaks Trail, Pearland, TX, 77584

Target date passed (Nov 2023)Review Complete

Massey Oaks Phase 1B is a new construction project at 4825 Massey Oaks Trail, Pearland, in Brazoria County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Nov 2023 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $770K across about 213,700 sq ft.

Estimated project value
$770K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
213,700 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$4/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
11 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 26, 2022377 days across supplied datesNov 7, 2023

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    36 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    341 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77584 (Pearland)

One email per change. Unsubscribe in one click. Privacy.

Massey Oaks Phase 1B is a New Construction project located at 4825 Massey Oaks Trail, Pearland, TX 77584 in Pearland, Texas. The project has an estimated value of $770K covering 213,700 sq ft. Massey Oaks Development, LP is the property owner and BGE, Inc. is the design firm of record. The project was registered with TDLR on October 26, 2022.

Frequently Asked Questions

What is Massey Oaks Phase 1B?

Massey Oaks Phase 1B is a new construction project at 4825 Massey Oaks Trail in Pearland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Splash pad, masonry wall, masonry columns, sidewalks, plantings, irrigation

Is Massey Oaks Phase 1B open in Pearland?

Massey Oaks Phase 1B was scheduled to finish construction in Nov 2023 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Massey Oaks Phase 1B located?

Massey Oaks Phase 1B is located at 4825 Massey Oaks Trail, Pearland, TX, 77584, in Brazoria County.

Who is the owner or developer of Massey Oaks Phase 1B?

Massey Oaks Development, LP is the property owner/developer of record for Massey Oaks Phase 1B, per its TDLR project registration.

Who is the architect or design firm for Massey Oaks Phase 1B?

BGE, Inc. is the design firm of record for Massey Oaks Phase 1B, according to its TDLR filing.

How much does Massey Oaks Phase 1B cost and how big is it?

Massey Oaks Phase 1B has an estimated construction value of $770K and approximately 213,700 square feet (about $4/sqft), based on its TDLR filing.

Scope of Work

Splash pad, masonry wall, masonry columns, sidewalks, plantings, irrigation

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

4825 Massey Oaks Trail, Pearland, TX, 77584

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77584 (Pearland)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Pearland?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.