Funding type
This project is privately funded, on private land for private use.
Taylor, TX Confidential Project
1530 FM 973, Taylor, TX, 76574
Taylor, TX Confidential Project is a new construction project at 1530 FM 973, Taylor, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Nov 2024 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $950.0M across about 800,000 sq ft.
- Estimated project value
- $950.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 800,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $1.19K/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2 years
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
731 days after the preceding date shown.
Source: TDLR filing
View source record
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76574 (Taylor)
One email per change. Unsubscribe in one click. Privacy.
Taylor, TX Confidential Project is a New Construction project located at 1530 FM 973, Taylor, TX 76574 in Taylor, Texas. The project has an estimated value of $950.0M covering 800,000 sq ft. Samsung Electronic Corporation is the property owner and Jacobs is the design firm of record. The project was registered with TDLR on November 5, 2022.
Frequently Asked Questions
What is Taylor, TX Confidential Project?
Taylor, TX Confidential Project is a new construction project at 1530 FM 973 in Taylor, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of a three-story manufacturing facility in Taylor, TX. with technical support space for manufacturing uses.
Is Taylor, TX Confidential Project open in Taylor?
Taylor, TX Confidential Project was scheduled to finish construction in Nov 2024 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Taylor, TX Confidential Project located?
Taylor, TX Confidential Project is located at 1530 FM 973, Taylor, TX, 76574, in Williamson County.
Who is the owner or developer of Taylor, TX Confidential Project?
Samsung Electronic Corporation is the property owner/developer of record for Taylor, TX Confidential Project, per its TDLR project registration.
Who is the architect or design firm for Taylor, TX Confidential Project?
Jacobs is the design firm of record for Taylor, TX Confidential Project, according to its TDLR filing.
How much does Taylor, TX Confidential Project cost and how big is it?
Taylor, TX Confidential Project has an estimated construction value of $950.0M and approximately 800,000 square feet (about $1.19K/sqft), based on its TDLR filing.
Scope of Work
Construction of a three-story manufacturing facility in Taylor, TX. with technical support space for manufacturing uses.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1530 FM 973, Taylor, TX, 76574
Related Projects
Same Owner
$1.26B totalRelated City Permits
Building permits found at or near this location
Hart - 40-15951 - Install new 7.6 kW rooftop solar system to existing residential only using line side tap only.
Replacement of complete existing central heat and air system with or without duct work
BASE: Installing a backup battery system and additional meter socket.
Replacement of complete existing central heat and air system with or without duct work
Replacement of an existing water heater
Watch all construction in 76574 (Taylor)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Taylor?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.