Project intelligenceTDLR TABS2023007799New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Precinct One - Park Playground Replacement in Houston, TX

15108 Cullen Blvd., Houston, TX, 77047

Construction complete · Oct 2022Inspection Complete

Precinct One - Park Playground Replacement is a new construction project at 15108 Cullen Blvd., Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2022). The project has an estimated value of $212K across about 6,146 sq ft.

Estimated project value
$212K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
6,146 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$34/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 22, 2022119 days across supplied datesDec 19, 2022

4 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    63 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  4. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    56 days after the preceding date shown.

    Source: TDLR filing

    View source record

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77047 (Houston)

One email per change. Unsubscribe in one click. Privacy.

Precinct One - Park Playground Replacement is a New Construction project located at 15108 Cullen Blvd., Houston, TX 77047 in Houston, Texas. The project has an estimated value of $212K covering 6,146 sq ft. Harris County Precinct One is the property owner and Kraftsman Commercial Playgrounds and Waerparks is the design firm of record. The project was registered with TDLR on December 19, 2022.

Frequently Asked Questions

What is Precinct One - Park Playground Replacement?

Precinct One - Park Playground Replacement is a new construction project at 15108 Cullen Blvd. in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Design and installation of playground equipment.

Is Precinct One - Park Playground Replacement open in Houston?

Construction on Precinct One - Park Playground Replacement is complete — TDLR records show the project passed its required accessibility inspection in Oct 2022. The building is finished and very likely open.

Where is Precinct One - Park Playground Replacement located?

Precinct One - Park Playground Replacement is located at 15108 Cullen Blvd., Houston, TX, 77047, in Harris County.

Who is the owner or developer of Precinct One - Park Playground Replacement?

Harris County Precinct One is the property owner/developer of record for Precinct One - Park Playground Replacement, per its TDLR project registration.

Who is the architect or design firm for Precinct One - Park Playground Replacement?

Kraftsman Commercial Playgrounds and Waerparks is the design firm of record for Precinct One - Park Playground Replacement, according to its TDLR filing.

How much does Precinct One - Park Playground Replacement cost and how big is it?

Precinct One - Park Playground Replacement has an estimated construction value of $212K and approximately 6,146 square feet (about $34/sqft), based on its TDLR filing.

Scope of Work

Design and installation of playground equipment.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

15108 Cullen Blvd., Houston, TX, 77047

Location by street address

Watch all construction in 77047 (Houston)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.