Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Deussen Park & Eisenhower Park Improvements
12303 Sonnier Street, Houston, TX, 77044
Deussen Park & Eisenhower Park Improvements is a renovation/alteration project at 12303 Sonnier Street, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Aug 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $14.5M across about 355,000 sq ft.
- Estimated project value
- $14.5M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 355,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $41/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 7mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
134 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
577 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Deussen Park & Eisenhower Park Improvements
The Deussen Park & Eisenhower Park Improvements project is a $14,500,000 renovation and alteration of public park infrastructure at 12303 Sonnier Street in Houston, Texas. Owned by Harris County Precinct One, the project covers 355,000 square feet of improvements. The registration with the Texas Department of Licensing and Regulation was filed in August 2023, establishing the official record for the site.
Scope and Design
The Deussen Park & Eisenhower Park Improvements involve the removal and replacement of existing infrastructure, including the parking lot, sidewalks, waterfront bulkhead, and boardwalk. Additional work includes shared-use trails, a pedestrian bridge, grading, paving, underground storm sewer installation, landscaping, and lighting. Cobb, Fendley & Associates, Inc. serves as the design firm of record, while Jeromy G Murphy is the registered accessibility specialist.
Construction for the Deussen Park & Eisenhower Park Improvements was scheduled to begin in January 2024, with a planned completion date of August 2025. The estimated cost per square foot is $41, which is below the Harris County median of $80 for similar renovation and alteration filings. The scheduled build window of 577 days is longer than the county median of 92 days, reflecting the scale of the public infrastructure upgrades. This project represents a significant investment in public amenities, with a cost above the county median for its type.
TDLR completed the plan review in August 2023, and the status is marked as Review Complete. However, TDLR has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record. The project involves public funds and public land, ensuring that the improvements meet state accessibility standards. Nearby projects in the area include the Deussen Park Maintenance Barn renovation and the United Therapeutics Houston DPF new construction, indicating ongoing development in the 77044 ZIP code.
Context and Comparison
Harris County Precinct One has six other TDLR-registered projects totaling $1,171,816, including playground and fitness site improvements at Tom Bass Park, Gene Green Park, El Franco Lee Park, Bane Park, and Christia Adair Park. The design firm, Cobb, Fendley & Associates, Inc., has worked on six other projects totaling $39,117,175, including road intersections and community centers in Houston and La Porte. The area profile for ZIP 77044 shows a population of about 55,746, with a median household income of $92,416 and a median owner-occupied home value of $274,500, according to U.S. Census ACS 2023 estimates.
The Harris County unemployment rate was 5.2 percent in July 2026, higher than a year earlier, according to FRED data. Third-party listings on ConstructConnect describe the project as site work and paving for a mixed-use development, though the TDLR filing specifically lists renovation and alteration of park infrastructure. The project’s scale and cost place it in the top quarter of similar filings in the county, underscoring its importance to the local community and public infrastructure network.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77044 (Houston)
One email per change. Unsubscribe in one click. Privacy.
Deussen Park & Eisenhower Park Improvements is a Renovation/Alteration project located at 12303 Sonnier Street, Houston, TX 77044 in Houston, Texas. The project has an estimated value of $14.5M covering 355,000 sq ft. Harris County Precinct One is the property owner and Cobb, Fendley & Associates, Inc. is the design firm of record. The project was registered with TDLR on August 21, 2023.
Frequently Asked Questions
Is the Deussen Park & Eisenhower Park Improvements project open to the public?
The TDLR record shows the project status as Review Complete but notes that TDLR has not yet recorded a final inspection. Therefore, the current operational status of the site is not confirmed in the public record.
Who is the owner of the Deussen Park & Eisenhower Park project?
Harris County Precinct One is the owner and developer of record for this renovation and alteration project located at 12303 Sonnier Street in Houston, Texas.
What is the total estimated cost of the project?
The estimated cost for the Deussen Park & Eisenhower Park Improvements is $14,500,000, covering 355,000 square feet of work including sidewalks, trails, and infrastructure upgrades.
When was the project registered with TDLR?
The project was registered with the Texas Department of Licensing and Regulation in August 2023, and plan review was completed in the same month.
What type of work is being performed?
The scope includes removing and replacing the parking lot, sidewalks, bulkhead, boardwalk, shared-use trails, pedestrian bridge, and associated grading, paving, and landscaping.
What is Deussen Park & Eisenhower Park Improvements?
Deussen Park & Eisenhower Park Improvements is a renovation/alteration project at 12303 Sonnier Street in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remove and Replace Existing Parking Lot and Sidewalks, Waterfront Bulkhead, Boardwalk, and associated Sidewalks, Shared use trails, pedestrian bridge, and associated grading, paving, underground storm sewer, landscaping, and lighting.
Is Deussen Park & Eisenhower Park Improvements open in Houston?
Deussen Park & Eisenhower Park Improvements was scheduled to finish construction in Aug 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Deussen Park & Eisenhower Park Improvements located?
Deussen Park & Eisenhower Park Improvements is located at 12303 Sonnier Street, Houston, TX, 77044, in Harris County.
Who is the owner or developer of Deussen Park & Eisenhower Park Improvements?
Harris County Precinct One is the property owner/developer of record for Deussen Park & Eisenhower Park Improvements, per its TDLR project registration.
Who is the architect or design firm for Deussen Park & Eisenhower Park Improvements?
Cobb, Fendley & Associates, Inc. is the design firm of record for Deussen Park & Eisenhower Park Improvements, according to its TDLR filing.
How much does Deussen Park & Eisenhower Park Improvements cost and how big is it?
Deussen Park & Eisenhower Park Improvements has an estimated construction value of $14.5M and approximately 355,000 square feet (about $41/sqft), based on its TDLR filing.
Scope of Work
Remove and Replace Existing Parking Lot and Sidewalks, Waterfront Bulkhead, Boardwalk, and associated Sidewalks, Shared use trails, pedestrian bridge, and associated grading, paving, underground storm sewer, landscaping, and lighting.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
12303 Sonnier Street, Houston, TX, 77044
Related Projects
Same Owner
$1.0M totalWatch all construction in 77044 (Houston)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Houston?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.