Project intelligenceTDLR TABS2023008742New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Vince Bayou Greenway Phase 1 in Pasadena, TX

500 West Jackson Ave, Pasadena, TX, 77506

Target date passed (Feb 2025)Review Complete

Vince Bayou Greenway Phase 1 is a new construction project at 500 West Jackson Ave, Pasadena, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Feb 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $3.6M across about 45,000 sq ft.

Estimated project value
$3.6M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
45,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$81/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
10 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 5, 2023785 days across supplied datesFeb 28, 2025

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    482 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    303 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77506 (Pasadena)

One email per change. Unsubscribe in one click. Privacy.

Vince Bayou Greenway Phase 1 is a New Construction project located at 500 West Jackson Ave, Pasadena, TX 77506 in Pasadena, Texas. The project has an estimated value of $3.6M covering 45,000 sq ft. City of Pasadena is the property owner and Clark Condon is the design firm of record. The project was registered with TDLR on January 5, 2023.

Frequently Asked Questions

What is Vince Bayou Greenway Phase 1?

Vince Bayou Greenway Phase 1 is a new construction project at 500 West Jackson Ave in Pasadena, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: concrete hike and bike trail, trailheads, pedestrian bridges, boardwalk

Is Vince Bayou Greenway Phase 1 open in Pasadena?

Vince Bayou Greenway Phase 1 was scheduled to finish construction in Feb 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Vince Bayou Greenway Phase 1 located?

Vince Bayou Greenway Phase 1 is located at 500 West Jackson Ave, Pasadena, TX, 77506, in Harris County.

Who is the owner or developer of Vince Bayou Greenway Phase 1?

City of Pasadena is the property owner/developer of record for Vince Bayou Greenway Phase 1, per its TDLR project registration.

Who is the architect or design firm for Vince Bayou Greenway Phase 1?

Clark Condon is the design firm of record for Vince Bayou Greenway Phase 1, according to its TDLR filing.

How much does Vince Bayou Greenway Phase 1 cost and how big is it?

Vince Bayou Greenway Phase 1 has an estimated construction value of $3.6M and approximately 45,000 square feet (about $81/sqft), based on its TDLR filing.

Scope of Work

concrete hike and bike trail, trailheads, pedestrian bridges, boardwalk

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

500 West Jackson Ave, Pasadena, TX, 77506

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77506 (Pasadena)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Pasadena?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.