Project intelligenceTDLR TABS2026009475Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Red Bluff Terrace Drainage Improvements - Phase 1 in Pasadena, TX

Normand St, Raymond St, Marshall St., Pasadena, TX, 77506

Opening ~Oct 2027Review Complete

Red Bluff Terrace Drainage Improvements - Phase 1 is a renovation/alteration project at Normand St, Raymond St, Marshall St., Pasadena, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Oct 2027. The project has an estimated value of $6.9M across about 288,500 sq ft.

Estimated project value
$6.9M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
288,500 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$24/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 6mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 7, 2026633 days across supplied datesOct 2, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    21 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    64 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    548 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Red Bluff Terrace Drainage Improvements - Phase 1

The City of Pasadena is leading a major renovation and alteration project known as Red Bluff Terrace Drainage Improvements - Phase 1. This initiative involves storm sewer installation and comprehensive pavement reconstruction across Normand Street, Raymond Street, and Marshall Street in Pasadena, Texas 77506. The scope covers 288,500 square feet of roadway, curbs, sidewalks, ADA ramps, and landscaping. The estimated cost for this significant infrastructure upgrade is $6,866,379.

HR Green, Inc. serves as the design firm of record for this filing, with Robert W Green registered as the accessibility specialist. The project was registered with the Texas Department of Licensing and Regulation (TDLR) in January 2026, and plan review was completed in the same month. Construction is scheduled to begin in April 2026 and is scheduled to finish in October 2027. This timeline spans 548 days, which is longer than the median scheduled build window of 92 days for renovation and alteration filings in Harris County.

Project Scale and Context

With an estimated cost of $6,866,379, this project sits in the top quarter of costs for similar renovation and alteration filings in Harris County, where the median estimated cost is $250,000. Despite the high total cost, the project’s cost per square foot is $24, which is below the county median of $80 per square foot. The City of Pasadena has six other TDLR-registered projects totaling $17,514,697, including road reconstructions on Perez Road and Cleveland Street, all of which have completed plan review.

HR Green, Inc. has five other TDLR-registered projects totaling $31,694,166, such as the Arlington Heights Subdivision in Houston and Butler Farms Phase 11 Amenity Center in Liberty Hill. This indicates a consistent pattern of large-scale public and private infrastructure design work by the firm across Texas. The project involves public funds and public land, qualifying it for specific federal and state oversight standards.

Local Impact and Area Profile

The work takes place in ZIP code 77506, where the U.S. Census Bureau’s American Community Survey 2023 five-year estimates report a population of about 35,243. The median household income in this area is $50,045, and there are approximately 11,973 housing units. Housing in this area is mostly renter-occupied, with a median owner-occupied home value of $131,800. These demographic and economic figures provide context for the community infrastructure being improved by the drainage and pavement reconstruction efforts.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77506 (Pasadena)

One email per change. Unsubscribe in one click. Privacy.

Red Bluff Terrace Drainage Improvements - Phase 1 is a Renovation/Alteration project located at Normand St, Raymond St, Marshall St., Pasadena, TX 77506 in Pasadena, Texas. The project has an estimated value of $6.9M covering 288,500 sq ft. City of Pasadena is the property owner and HR Green, Inc. is the design firm of record. The project was registered with TDLR on January 7, 2026.

Frequently Asked Questions

When is the construction scheduled to finish?

Construction is scheduled to finish in October 2027, with work starting in April 2026. Plan review was completed in January 2026.

Who is the owner of the project?

The owner of record is the City of Pasadena. HR Green, Inc. is the design firm of record.

What is the estimated cost of the project?

The estimated cost is $6,866,379. This places the project in the top quarter of costs for similar filings in Harris County.

What specific work is included in the scope?

The scope includes storm sewer installation and pavement reconstruction for roadway, curb, sidewalks, ADA ramps, and landscaping across 288,500 square feet.

Is the project currently open to the public?

The project is under construction and scheduled to finish in October 2027. It is not yet open or operating.

What is Red Bluff Terrace Drainage Improvements - Phase 1?

Red Bluff Terrace Drainage Improvements - Phase 1 is a renovation/alteration project at Normand St, Raymond St, Marshall St. in Pasadena, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Storm sewer installation and pavement reconstruction (roadway, curb, sidewalks, ADA ramps, and landscaping)- 288,500 sq.ft.

Is Red Bluff Terrace Drainage Improvements - Phase 1 open in Pasadena?

Red Bluff Terrace Drainage Improvements - Phase 1 is still under construction in Pasadena, TX, with an estimated completion of Oct 2027 according to its TDLR registration.

Where is Red Bluff Terrace Drainage Improvements - Phase 1 located?

Red Bluff Terrace Drainage Improvements - Phase 1 is located at Normand St, Raymond St, Marshall St., Pasadena, TX, 77506, in Harris County.

Who is the owner or developer of Red Bluff Terrace Drainage Improvements - Phase 1?

City of Pasadena is the property owner/developer of record for Red Bluff Terrace Drainage Improvements - Phase 1, per its TDLR project registration.

Who is the architect or design firm for Red Bluff Terrace Drainage Improvements - Phase 1?

HR Green, Inc. is the design firm of record for Red Bluff Terrace Drainage Improvements - Phase 1, according to its TDLR filing.

How much does Red Bluff Terrace Drainage Improvements - Phase 1 cost and how big is it?

Red Bluff Terrace Drainage Improvements - Phase 1 has an estimated construction value of $6.9M and approximately 288,500 square feet (about $24/sqft), based on its TDLR filing.

Scope of Work

Storm sewer installation and pavement reconstruction (roadway, curb, sidewalks, ADA ramps, and landscaping)- 288,500 sq.ft.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Normand St, Raymond St, Marshall St., Pasadena, TX, 77506

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77506 (Pasadena)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Pasadena?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.