Project intelligenceTDLR TABS2026023998Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Arlington Heights Drainage and Paving Improvements (Sub-Project 2)

Empress Dr, Princess Dr, Outlook Dr, Ravenhead Dr, Viceroy Dr, Coronation Dr, Darlene Ln and Freemont, Houston, TX, 77034

Opening ~Feb 2029Review Complete

Arlington Heights Drainage and Paving Improvements (Sub-Project 2) is a renovation/alteration project at Empress Dr, Princess Dr, Outlook Dr, Ravenhead Dr, Viceroy Dr, Coronation Dr, Darlene Ln and Freemont, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Feb 2029. The project has an estimated value of $19.2M across about 760,090 sq ft.

Estimated project value
$19.2M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
760,090 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$25/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2y 1mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 29, 2026973 days across supplied datesFeb 26, 2029

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    38 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    187 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    748 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Arlington Heights Drainage and Paving Improvements (Sub-Project 2)

The Arlington Heights Subdivision project in Houston is a large-scale renovation and alteration effort focused on drainage, paving, and accessibility improvements. The filing identifies the scope as Arlington Heights Drainage and Paving Improvements (Sub-Project 2), covering a total area of 760,090 sq ft. The work includes storm sewer and sanitary waterline installation, along with pavement reconstruction for roadways, curbs, sidewalks, ADA ramps, and landscaping.

Project Details and Status

Located in Harris County, the project affects multiple streets including Empress Dr, Princess Dr, Outlook Dr, Ravenhead Dr, Viceroy Dr, Coronation Dr, Darlene Ln, and Freemont in the 77034 ZIP code. The City of Houston is the owner of record, with HR Green, Inc. serving as the design firm. Robert W Green is the registered accessibility specialist for the project. The estimated cost is $19,185,620, which equates to approximately $25 per square foot.

TDLR completed plan review in August 2026 and construction is scheduled to finish in February 2029, with work starting February 2027. The project involves public funds, public land, or is a Federally funded roadway project. The TDLR status is Review Complete. This registration was recorded in June 2026.

In Harris County, the median estimated cost for renovation and alteration filings is $250,000, with a median size of 4,000 sq ft and a median cost of $80 per square foot. This project’s cost is above the county median for its type, placing it in the top quarter of filings. Its scheduled build window of 748 days is longer than the county median of 92 days. However, its $25 per square foot cost is below the county median of $80.

HR Green, Inc. has five other TDLR-registered projects totaling $19,374,925, including Red Bluff Terrace in Pasadena and Butler Farms Phase 11 Amenity Center in Liberty Hill. The City of Houston has six other TDLR-registered projects totaling $10,332,655, such as Trinity Gardens Park and Marron Park Way phases. These comparisons highlight the scale of this specific infrastructure investment relative to other municipal and private filings in the region.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77034 (Houston)

One email per change. Unsubscribe in one click. Privacy.

Arlington Heights Drainage and Paving Improvements (Sub-Project 2) is a Renovation/Alteration project located at Empress Dr, Princess Dr, Outlook Dr, Ravenhead Dr, Viceroy Dr, Coronation Dr, Darlene Ln and Freemont, Houston, TX 77034 in Houston, Texas. The project has an estimated value of $19.2M covering 760,090 sq ft. City of Houston is the property owner and HR Green, Inc. is the design firm of record. The project was registered with TDLR on June 29, 2026.

Frequently Asked Questions

Is the Arlington Heights Subdivision project open?

The project is under construction and not yet complete. TDLR records show construction is scheduled to finish in February 2029, with work starting in February 2027. It is not operating as a finished facility.

What is the estimated cost of the project?

The estimated cost is $19,185,620. This figure covers the scope of work, which includes storm sewer, sanitary waterline installation, and pavement reconstruction for 760,090 sq ft.

Who is the design firm for this project?

HR Green, Inc. is the design firm of record. Robert W Green is the registered accessibility specialist associated with the project filing.

When is construction scheduled to start?

Construction is scheduled to start in February 2027. Plan review was completed in August 2026, and the project is scheduled to finish in February 2029.

What streets are affected by this project?

The project affects Empress Dr, Princess Dr, Outlook Dr, Ravenhead Dr, Viceroy Dr, Coronation Dr, Darlene Ln, and Freemont in Houston, TX 77034.

What is Arlington Heights Drainage and Paving Improvements (Sub-Project 2)?

Arlington Heights Drainage and Paving Improvements (Sub-Project 2) is a renovation/alteration project at Empress Dr, Princess Dr, Outlook Dr, Ravenhead Dr, Viceroy Dr, Coronation Dr, Darlene Ln and Freemont in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Storm sewer, sanitary waterline installation as well as pavement reconstruction (roadway, curb, sidewalks, ADA ramps, and landscaping) - 760,090 sq. ft.

Is Arlington Heights Drainage and Paving Improvements (Sub-Project 2) open in Houston?

Arlington Heights Drainage and Paving Improvements (Sub-Project 2) is still under construction in Houston, TX, with an estimated completion of Feb 2029 according to its TDLR registration.

Where is Arlington Heights Drainage and Paving Improvements (Sub-Project 2) located?

Arlington Heights Drainage and Paving Improvements (Sub-Project 2) is located at Empress Dr, Princess Dr, Outlook Dr, Ravenhead Dr, Viceroy Dr, Coronation Dr, Darlene Ln and Freemont, Houston, TX, 77034, in Harris County.

Who is the owner or developer of Arlington Heights Drainage and Paving Improvements (Sub-Project 2)?

City of Houston is the property owner/developer of record for Arlington Heights Drainage and Paving Improvements (Sub-Project 2), per its TDLR project registration.

Who is the architect or design firm for Arlington Heights Drainage and Paving Improvements (Sub-Project 2)?

HR Green, Inc. is the design firm of record for Arlington Heights Drainage and Paving Improvements (Sub-Project 2), according to its TDLR filing.

How much does Arlington Heights Drainage and Paving Improvements (Sub-Project 2) cost and how big is it?

Arlington Heights Drainage and Paving Improvements (Sub-Project 2) has an estimated construction value of $19.2M and approximately 760,090 square feet (about $25/sqft), based on its TDLR filing.

Scope of Work

Storm sewer, sanitary waterline installation as well as pavement reconstruction (roadway, curb, sidewalks, ADA ramps, and landscaping) - 760,090 sq. ft.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Empress Dr, Princess Dr, Outlook Dr, Ravenhead Dr, Viceroy Dr, Coronation Dr, Darlene Ln and Freemont, Houston, TX, 77034