HRI
HRI is a renovation/alteration project at 4499 Medical Dr., San Antonio, in Bexar County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2023). The project has an estimated value of $280K across about 4,765 sq ft.
๐Project Metrics
TDLR #TABS2023009598Inspection Complete
Final inspection completed, awaiting project closure
HRI is a Renovation/Alteration project located at 4499 Medical Dr., San Antonio, TX 78229 in San Antonio, Texas. The project has an estimated value of $280K covering 4,765 sq ft. Methodist Healthcare Systems of SA, LTD is the property owner and Insite Design & Planning is the design firm of record. The project was registered with TDLR on January 17, 2023.
โFrequently Asked Questions
What is HRI?
HRI is a renovation/alteration project at 4499 Medical Dr. in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior finish out of medical office
Is HRI open in San Antonio?
Construction on HRI is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2023. The building is finished and very likely open.
Where is HRI located?
HRI is located at 4499 Medical Dr., San Antonio, TX, 78229, in Bexar County.
Who is the owner or developer of HRI?
Methodist Healthcare Systems of SA, LTD is the property owner/developer of record for HRI, per its TDLR project registration.
Who is the architect or design firm for HRI?
Insite Design & Planning is the design firm of record for HRI, according to its TDLR filing.
How much does HRI cost and how big is it?
HRI has an estimated construction value of $280K and approximately 4,765 square feet (about $59/sqft), based on its TDLR filing.
๐Scope of Work
Interior finish out of medical office
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 17, 2023
Review Complete
Inspection Complete
Apr 29, 2023
Closed