Project intelligenceTDLR TABS2023009679Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

TC9 Hoya Racking Update in Dfw Airport, TX

755 Regent Boulevard, Dfw Airport, TX, 75063

Construction complete · Aug 2023Project Closed

TC9 Hoya Racking Update is a renovation/alteration project at 755 Regent Boulevard, Dfw Airport, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2023). The project has an estimated value of $85K across about 101,622 sq ft.

Estimated project value
$85K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
101,622 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$1/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
7 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 18, 2023195 days across supplied datesAug 1, 2023

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    195 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75063 (Dfw Airport)

One email per change. Unsubscribe in one click. Privacy.

TC9 Hoya Racking Update is a Renovation/Alteration project located at 755 Regent Boulevard, Dfw Airport, TX 75063 in Dfw Airport, Texas. The project has an estimated value of $85K covering 101,622 sq ft. CBRE is the property owner and Meinhardt & Associates Architects P.L.L.C. is the design firm of record. The project was registered with TDLR on January 18, 2023.

Frequently Asked Questions

What is TC9 Hoya Racking Update?

TC9 Hoya Racking Update is a renovation/alteration project at 755 Regent Boulevard in Dfw Airport, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Racking update within existing warehouse

Is TC9 Hoya Racking Update open in Dfw Airport?

Construction on TC9 Hoya Racking Update is complete — TDLR records show the project passed its required accessibility inspection in Aug 2023. The building is finished and very likely open.

Where is TC9 Hoya Racking Update located?

TC9 Hoya Racking Update is located at 755 Regent Boulevard, Dfw Airport, TX, 75063, in Dallas County.

Who is the owner or developer of TC9 Hoya Racking Update?

CBRE is the property owner/developer of record for TC9 Hoya Racking Update, per its TDLR project registration.

Who is the architect or design firm for TC9 Hoya Racking Update?

Meinhardt & Associates Architects P.L.L.C. is the design firm of record for TC9 Hoya Racking Update, according to its TDLR filing.

How much does TC9 Hoya Racking Update cost and how big is it?

TC9 Hoya Racking Update has an estimated construction value of $85K and approximately 101,622 square feet (about $1/sqft), based on its TDLR filing.

Scope of Work

Racking update within existing warehouse

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

755 Regent Boulevard, Dfw Airport, TX, 75063

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75063 (Dfw Airport)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Dfw Airport?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.