Wylie Crossing
Wylie Crossing is a renovation/alteration project at 465 Country Club Road, Wylie, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2023). The project has an estimated value of $87K across about 2,900 sq ft.
๐Project Metrics
TDLR #TABS2023010339Project Closed
Project has been completed and closed
Wylie Crossing is a Renovation/Alteration project located at 465 Country Club Road, Wylie, TX 75098 in Wylie, Texas. The project has an estimated value of $87K covering 2,900 sq ft. WinWin Holdings is the property owner and Hodges Architecture is the design firm of record. The project was registered with TDLR on January 26, 2023.
โFrequently Asked Questions
What is Wylie Crossing?
Wylie Crossing is a renovation/alteration project at 465 Country Club Road in Wylie, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Split existing suite into 2 white box suites.
Is Wylie Crossing open in Wylie?
Construction on Wylie Crossing is complete โ TDLR records show the project passed its required accessibility inspection in Jul 2023. The building is finished and very likely open.
Where is Wylie Crossing located?
Wylie Crossing is located at 465 Country Club Road, Wylie, TX, 75098, in Collin County.
Who is the owner or developer of Wylie Crossing?
WinWin Holdings is the property owner/developer of record for Wylie Crossing, per its TDLR project registration.
Who is the architect or design firm for Wylie Crossing?
Hodges Architecture is the design firm of record for Wylie Crossing, according to its TDLR filing.
How much does Wylie Crossing cost and how big is it?
Wylie Crossing has an estimated construction value of $87K and approximately 2,900 square feet (about $30/sqft), based on its TDLR filing.
๐Scope of Work
Split existing suite into 2 white box suites.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 26, 2023
Review Complete
Inspection Complete
Closed
Jul 3, 2023