Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
RISD Rochell Elementary School Replacement in Rockwall, TX
401 East Ralph Hall Pkwy, Rockwall, TX, 75202
RISD Rochell Elementary School Replacement is a new construction project at 401 East Ralph Hall Pkwy, Rockwall, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Oct 2024 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $38.0M across about 77,680 sq ft.
- Estimated project value
- $38.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 77,680 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $489/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 6mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
66 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
547 days after the preceding date shown.
Source: TDLR filing
View source record
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75202 (Rockwall)
One email per change. Unsubscribe in one click. Privacy.
RISD Rochell Elementary School Replacement is a New Construction project located at 401 East Ralph Hall Pkwy, Rockwall, TX 75202 in Rockwall, Texas. The project has an estimated value of $38.0M covering 77,680 sq ft. Rockwall Independent School District is the property owner. The project was registered with TDLR on January 27, 2023.
Frequently Asked Questions
What is RISD Rochell Elementary School Replacement?
RISD Rochell Elementary School Replacement is a new construction project at 401 East Ralph Hall Pkwy in Rockwall, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Demolition of existing elementary school, and new construction of replacement school. School is pre-k through 5th grade, with gymnasium (stormshelter), cafeteria, library, and (2) two-story classroom wings.
Is RISD Rochell Elementary School Replacement open in Rockwall?
RISD Rochell Elementary School Replacement was scheduled to finish construction in Oct 2024 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is RISD Rochell Elementary School Replacement located?
RISD Rochell Elementary School Replacement is located at 401 East Ralph Hall Pkwy, Rockwall, TX, 75202, in Dallas County.
Who is the owner or developer of RISD Rochell Elementary School Replacement?
Rockwall Independent School District is the property owner/developer of record for RISD Rochell Elementary School Replacement, per its TDLR project registration.
How much does RISD Rochell Elementary School Replacement cost and how big is it?
RISD Rochell Elementary School Replacement has an estimated construction value of $38.0M and approximately 77,680 square feet (about $489/sqft), based on its TDLR filing.
Scope of Work
Demolition of existing elementary school, and new construction of replacement school. School is pre-k through 5th grade, with gymnasium (stormshelter), cafeteria, library, and (2) two-story classroom wings.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
401 East Ralph Hall Pkwy, Rockwall, TX, 75202
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Watch all construction in 75202 (Rockwall)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Rockwall?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.