Project intelligenceTDLR TABS2023010738Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

AMCHS Renovations - Phase II in College Station, TX

1801 Harvey Mitchell Pkwy S, College Station, TX, 77840

Construction complete · Aug 2023Project Closed

AMCHS Renovations - Phase II is a renovation/alteration project at 1801 Harvey Mitchell Pkwy S, College Station, in Brazos County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2023). The project has an estimated value of $4.6M across about 396,022 sq ft.

Estimated project value
$4.6M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
396,022 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$12/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
5 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 1, 2023188 days across supplied datesAug 8, 2023

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    48 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    140 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77840 (College Station)

One email per change. Unsubscribe in one click. Privacy.

AMCHS Renovations - Phase II is a Renovation/Alteration project located at 1801 Harvey Mitchell Pkwy S, College Station, TX 77840 in College Station, Texas. The project has an estimated value of $4.6M covering 396,022 sq ft. College Station Independent School District is the property owner and VLK Architects Inc is the design firm of record. The project was registered with TDLR on February 1, 2023.

Frequently Asked Questions

What is AMCHS Renovations - Phase II?

AMCHS Renovations - Phase II is a renovation/alteration project at 1801 Harvey Mitchell Pkwy S in College Station, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovations to existing High School that includes a security vestibule reconfiguration and finish upgrades

Is AMCHS Renovations - Phase II open in College Station?

Construction on AMCHS Renovations - Phase II is complete — TDLR records show the project passed its required accessibility inspection in Aug 2023. The building is finished and very likely open.

Where is AMCHS Renovations - Phase II located?

AMCHS Renovations - Phase II is located at 1801 Harvey Mitchell Pkwy S, College Station, TX, 77840, in Brazos County.

Who is the owner or developer of AMCHS Renovations - Phase II?

College Station Independent School District is the property owner/developer of record for AMCHS Renovations - Phase II, per its TDLR project registration.

Who is the architect or design firm for AMCHS Renovations - Phase II?

VLK Architects Inc is the design firm of record for AMCHS Renovations - Phase II, according to its TDLR filing.

How much does AMCHS Renovations - Phase II cost and how big is it?

AMCHS Renovations - Phase II has an estimated construction value of $4.6M and approximately 396,022 square feet (about $12/sqft), based on its TDLR filing.

Scope of Work

Renovations to existing High School that includes a security vestibule reconfiguration and finish upgrades

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1801 Harvey Mitchell Pkwy S, College Station, TX, 77840

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77840 (College Station)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in College Station?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.