Renovations at Summitt Elementary School
๐Project Metrics
TDLR #TABS2023011398Project Closed
Project has been completed and closed
๐Scope of Work
Three Water Source Heat Pumps are well beyond their service life and need to be replaced. WSHP-6 and WSHP-7 are being replaced like for like of the same size/capacity, in the same location. WSHP-8 has been replaced with a rooftop unit to allow space
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐Related City Permits
Building permits found at or near this location
pool - New concrete pool and spa with heater
Cap off of Water & Wastewater for a Total Demo of SFR 1100 Sqft circa 1953
Replacement of complete existing central heat and air system with or without duct work
pool - New concrete pool and spa with heater
Total Demo of SFR 1100 Sqft circa 1953