Project intelligenceTDLR TABS2023015316New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

East Pflugerville Parkway Weiss Jesse Bohls Connection

East Pflugerville Parkway, Pflugerville, TX, 78660

Opening ~Dec 2026Review Complete

East Pflugerville Parkway Weiss Jesse Bohls Connection is a new construction project at East Pflugerville Parkway, Pflugerville, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2026. The project has an estimated value of $16.0M across about 836,352 sq ft.

Estimated project value
$16.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
836,352 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$19/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 years
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 29, 20231,343 days across supplied datesDec 1, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    254 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    1,089 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About East Pflugerville Parkway Weiss Jesse Bohls Connection

The East Pflugerville Parkway Weiss Jesse Bohls Connection is a new construction roadway project in Pflugerville, Texas, with an estimated cost of $16,000,000. The project covers 836,352 sq ft of right-of-way and improvements, representing a significant infrastructure investment for Williamson County. This development is scheduled to finish in December 2026, with construction work starting in December 2023.

The City of Pflugerville is the owner of record for this public infrastructure project. LJA Engineering serves as the design firm of record, overseeing the technical aspects of the build. The registered accessibility specialist on the TDLR filing is Jesus E Lardizabal. The project was registered with the Texas Department of Licensing and Regulation in March 2023, and plan review was completed in the same month.

Scope of Work

The filing details a comprehensive scope of work that goes beyond simple paving. The project includes grading, storm water systems with detention, and drainage culverts. Erosion control measures are also part of the plan to manage site stability. Pedestrian facilities, signage, and pavement markings are included to ensure safe navigation for all users. Illumination and traffic signals are specified to manage flow and visibility at the new connection points.

With a cost of $16,000,000, this project sits above the median estimated cost for new construction filings in Williamson County. The median cost for similar projects in the county is $850,000, placing this roadway project in the top quarter of recent filings. The scheduled build window is 1089 days, which is longer than the county median of 245 days. This extended timeline reflects the complexity of the civil works involved, including the installation of storm water and drainage infrastructure.

The project is located at East Pflugerville Parkway, Pflugerville, TX 78660. The area is part of ZIP code 78660, which has a population of about 118,437 according to U.S. Census ACS 2023 five-year estimates. The median household income in this area is $109,522, and the median owner-occupied home value is $369,300. Nearby businesses include the Baylor Scott & White Medical Center - Pflugerville and Enclave Falcon Pointe Apartments, indicating a well-established community with significant residential and medical presence.

The City of Pflugerville has six other TDLR-registered projects totaling $49,723,155, including the Kelly Lane project valued at $40,000,000. LJA Engineering has worked on six other projects totaling $1,799,130, including the Cedar Creek Elementary school in Austin. This project involves public funds and is a Federally funded roadway project, reflecting the multi-layered funding structure typical of major infrastructure developments in Texas.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78660 (Pflugerville)

One email per change. Unsubscribe in one click. Privacy.

East Pflugerville Parkway Weiss Jesse Bohls Connection is a New Construction project located at East Pflugerville Parkway, Pflugerville, TX 78660 in Pflugerville, Texas. The project has an estimated value of $16.0M covering 836,352 sq ft. City of Pflugerville is the property owner and LJA Engineering is the design firm of record. The project was registered with TDLR on March 29, 2023.

Frequently Asked Questions

Is the East Pflugerville Parkway project open to traffic?

The project is under construction and is scheduled to finish in December 2026. It is not open as a completed facility. Construction started in December 2023.

Who is building the East Pflugerville Parkway connection?

The City of Pflugerville is the owner. LJA Engineering is the design firm. Jesus E Lardizabal is the registered accessibility specialist.

How much does this project cost?

The estimated cost is $16,000,000. This is above the median cost for new construction in Williamson County.

What is included in the scope of work?

The scope includes paving, grading, storm water systems, detention, drainage culverts, erosion control, pedestrian facilities, signage, markings, illumination, and traffic signals.

When will the project be finished?

The project is scheduled to finish in December 2026. Plan review was completed in March 2023.

What is East Pflugerville Parkway Weiss Jesse Bohls Connection?

East Pflugerville Parkway Weiss Jesse Bohls Connection is a new construction project at East Pflugerville Parkway in Pflugerville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: CONSISTS OF PAVING, GRADING, STORM WATER SYSTEMS W/ DETENTION, DRAINAGE CULVERTS EROSION CONTROL, PEDESTRIAN FACILITIES, SIGNAGE, PAVEMENT MARKINGS, ILLUMINATION, AND TRAFFIC SIGNALS.

Is East Pflugerville Parkway Weiss Jesse Bohls Connection open in Pflugerville?

East Pflugerville Parkway Weiss Jesse Bohls Connection is still under construction in Pflugerville, TX, with an estimated completion of Dec 2026 according to its TDLR registration.

Where is East Pflugerville Parkway Weiss Jesse Bohls Connection located?

East Pflugerville Parkway Weiss Jesse Bohls Connection is located at East Pflugerville Parkway, Pflugerville, TX, 78660, in Williamson County.

Who is the owner or developer of East Pflugerville Parkway Weiss Jesse Bohls Connection?

City of Pflugerville is the property owner/developer of record for East Pflugerville Parkway Weiss Jesse Bohls Connection, per its TDLR project registration.

Who is the architect or design firm for East Pflugerville Parkway Weiss Jesse Bohls Connection?

LJA Engineering is the design firm of record for East Pflugerville Parkway Weiss Jesse Bohls Connection, according to its TDLR filing.

How much does East Pflugerville Parkway Weiss Jesse Bohls Connection cost and how big is it?

East Pflugerville Parkway Weiss Jesse Bohls Connection has an estimated construction value of $16.0M and approximately 836,352 square feet (about $19/sqft), based on its TDLR filing.

Scope of Work

CONSISTS OF PAVING, GRADING, STORM WATER SYSTEMS W/ DETENTION, DRAINAGE CULVERTS EROSION CONTROL, PEDESTRIAN FACILITIES, SIGNAGE, PAVEMENT MARKINGS, ILLUMINATION, AND TRAFFIC SIGNALS.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

East Pflugerville Parkway, Pflugerville, TX, 78660

Location by street address

Watch all construction in 78660 (Pflugerville)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Pflugerville?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.