Project intelligenceTDLR TABS2023017171Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Schultz Junior High Improvements in Waller, TX

20950 Field Store RD, Waller, TX, 77484

Construction complete · Aug 2023Project Closed

Schultz Junior High Improvements is a renovation/alteration project at 20950 Field Store RD, Waller, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2023). The project has an estimated value of $1.0M across about 80,000 sq ft.

Estimated project value
$1.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
80,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$13/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 21, 2023105 days across supplied datesAug 4, 2023

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    38 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    67 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77484 (Waller)

One email per change. Unsubscribe in one click. Privacy.

Schultz Junior High Improvements is a Renovation/Alteration project located at 20950 Field Store RD, Waller, TX 77484 in Waller, Texas. The project has an estimated value of $1.0M covering 80,000 sq ft. Waller ISD is the property owner and VLK Architects Inc is the design firm of record. The project was registered with TDLR on April 21, 2023.

Frequently Asked Questions

What is Schultz Junior High Improvements?

Schultz Junior High Improvements is a renovation/alteration project at 20950 Field Store RD in Waller, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior Finishes

Is Schultz Junior High Improvements open in Waller?

Construction on Schultz Junior High Improvements is complete — TDLR records show the project passed its required accessibility inspection in Aug 2023. The building is finished and very likely open.

Where is Schultz Junior High Improvements located?

Schultz Junior High Improvements is located at 20950 Field Store RD, Waller, TX, 77484, in Harris County.

Who is the owner or developer of Schultz Junior High Improvements?

Waller ISD is the property owner/developer of record for Schultz Junior High Improvements, per its TDLR project registration.

Who is the architect or design firm for Schultz Junior High Improvements?

VLK Architects Inc is the design firm of record for Schultz Junior High Improvements, according to its TDLR filing.

How much does Schultz Junior High Improvements cost and how big is it?

Schultz Junior High Improvements has an estimated construction value of $1.0M and approximately 80,000 square feet (about $13/sqft), based on its TDLR filing.

Scope of Work

Interior Finishes

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

20950 Field Store RD, Waller, TX, 77484

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77484 (Waller)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.