Troy W. Main/ Luther Curtis Rd.
Troy W. Main/ Luther Curtis Rd. is a renovation/alteration project at 201 East Main Street, Troy, in Bell County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2024). The project has an estimated value of $1.2M across about 1,450,000 sq ft.
๐Project Metrics
TDLR #TABS2023017378Project Closed
Project has been completed and closed
Troy W. Main/ Luther Curtis Rd. is a Renovation/Alteration project located at 201 East Main Street, Troy, TX 76579 in Troy, Texas. The project has an estimated value of $1.2M covering 1,450,000 sq ft. City of Troy is the property owner and MRB Group is the design firm of record. The project was registered with TDLR on April 24, 2023.
โFrequently Asked Questions
What is Troy W. Main/ Luther Curtis Rd.?
Troy W. Main/ Luther Curtis Rd. is a renovation/alteration project at 201 East Main Street in Troy, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Reconstruction of roadways including driveways, sidewalks, and ADA ramps
Is Troy W. Main/ Luther Curtis Rd. open in Troy?
Construction on Troy W. Main/ Luther Curtis Rd. is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2024. The building is finished and very likely open.
Where is Troy W. Main/ Luther Curtis Rd. located?
Troy W. Main/ Luther Curtis Rd. is located at 201 East Main Street, Troy, TX, 76579, in Bell County.
Who is the owner or developer of Troy W. Main/ Luther Curtis Rd.?
City of Troy is the property owner/developer of record for Troy W. Main/ Luther Curtis Rd., per its TDLR project registration.
Who is the architect or design firm for Troy W. Main/ Luther Curtis Rd.?
MRB Group is the design firm of record for Troy W. Main/ Luther Curtis Rd., according to its TDLR filing.
How much does Troy W. Main/ Luther Curtis Rd. cost and how big is it?
Troy W. Main/ Luther Curtis Rd. has an estimated construction value of $1.2M and approximately 1,450,000 square feet (about $1/sqft), based on its TDLR filing.
๐Scope of Work
Reconstruction of roadways including driveways, sidewalks, and ADA ramps
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 24, 2023
Review Complete
Inspection Complete
Closed
Jun 28, 2024