Project intelligenceTDLR TABS2023018119Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Renovations to Winona Fire Station No. 3 in Gladewater, TX

2233 Hwy 271, Gladewater, TX, 75647

Construction complete · Aug 2023Project Closed

Renovations to Winona Fire Station No. 3 is a renovation/alteration project at 2233 Hwy 271, Gladewater, in Smith County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2023). The project has an estimated value of $124K across about 1,260 sq ft.

Estimated project value
$124K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,260 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$99/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

May 2, 2023120 days across supplied datesAug 30, 2023

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    6 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    114 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75647 (Gladewater)

One email per change. Unsubscribe in one click. Privacy.

Renovations to Winona Fire Station No. 3 is a Renovation/Alteration project located at 2233 Hwy 271, Gladewater, TX 75647 in Gladewater, Texas. The project has an estimated value of $124K covering 1,260 sq ft. Smith County Emergency Services District 2 is the property owner and Harris Craig Architects, Inc. is the design firm of record. The project was registered with TDLR on May 2, 2023.

Frequently Asked Questions

What is Renovations to Winona Fire Station No. 3?

Renovations to Winona Fire Station No. 3 is a renovation/alteration project at 2233 Hwy 271 in Gladewater, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: General renovations of existing storage space into bunkroom. Work includes relocation of plumbing and installation of all new finishes.

Is Renovations to Winona Fire Station No. 3 open in Gladewater?

Construction on Renovations to Winona Fire Station No. 3 is complete — TDLR records show the project passed its required accessibility inspection in Aug 2023. The building is finished and very likely open.

Where is Renovations to Winona Fire Station No. 3 located?

Renovations to Winona Fire Station No. 3 is located at 2233 Hwy 271, Gladewater, TX, 75647, in Smith County.

Who is the owner or developer of Renovations to Winona Fire Station No. 3?

Smith County Emergency Services District 2 is the property owner/developer of record for Renovations to Winona Fire Station No. 3, per its TDLR project registration.

Who is the architect or design firm for Renovations to Winona Fire Station No. 3?

Harris Craig Architects, Inc. is the design firm of record for Renovations to Winona Fire Station No. 3, according to its TDLR filing.

How much does Renovations to Winona Fire Station No. 3 cost and how big is it?

Renovations to Winona Fire Station No. 3 has an estimated construction value of $124K and approximately 1,260 square feet (about $99/sqft), based on its TDLR filing.

Scope of Work

General renovations of existing storage space into bunkroom. Work includes relocation of plumbing and installation of all new finishes.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

2233 Hwy 271, Gladewater, TX, 75647

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75647 (Gladewater)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Gladewater?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.