Project intelligenceTDLR TABS2023019248Additions to Existing Building
Funding type

This project is privately funded, on private land for private use.

Circle K EV Webberville & Texas 130 in Austin, TX

12200 FM 969, Austin, TX, 78724

Construction complete · Sep 2023Project Closed

Circle K EV Webberville & Texas 130 is a additions to existing building project at 12200 FM 969, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2023). The project has an estimated value of $225K across about 2,193 sq ft.

Estimated project value
$225K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
2,193 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$103/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

May 16, 2023108 days across supplied datesSep 1, 2023

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    77 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    31 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78724 (Austin)

One email per change. Unsubscribe in one click. Privacy.

Circle K EV Webberville & Texas 130 is a Additions to Existing Building project located at 12200 FM 969, Austin, TX 78724 in Austin, Texas. The project has an estimated value of $225K covering 2,193 sq ft. Circle K Stores, Inc. is the property owner. The project was registered with TDLR on May 16, 2023.

Frequently Asked Questions

What is Circle K EV Webberville & Texas 130?

Circle K EV Webberville & Texas 130 is a additions to existing building project at 12200 FM 969 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Addition of EV Chargers

Is Circle K EV Webberville & Texas 130 open in Austin?

Construction on Circle K EV Webberville & Texas 130 is complete — TDLR records show the project passed its required accessibility inspection in Sep 2023. The building is finished and very likely open.

Where is Circle K EV Webberville & Texas 130 located?

Circle K EV Webberville & Texas 130 is located at 12200 FM 969, Austin, TX, 78724, in Travis County.

Who is the owner or developer of Circle K EV Webberville & Texas 130?

Circle K Stores, Inc. is the property owner/developer of record for Circle K EV Webberville & Texas 130, per its TDLR project registration.

How much does Circle K EV Webberville & Texas 130 cost and how big is it?

Circle K EV Webberville & Texas 130 has an estimated construction value of $225K and approximately 2,193 square feet (about $103/sqft), based on its TDLR filing.

Scope of Work

Addition of EV Chargers

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

12200 FM 969, Austin, TX, 78724

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Related City Permits

Building permits found at or near this location

12200 N MOPAC EXPY SVRD SB

Change of Use from Various (Photo Studio) to Retail - No remodel proposed.

FinalBuilding PermitRemodelSep 2026
View Details
2026-127322 BP
Trosich Construction Company
12200 CARDINAL FLOWER DR

Backflow Prevention Assembly Test.

WithdrawnPlumbing PermitRepairSep 2026
View Details
2026-121226 PP
ABC Home & Commercial Service
12200 BARREL BND

Repair of subfloor sanitary sewer system via tunnel excavation.

FinalPlumbing PermitRepairAug 2026
View Details
2026-102928 PP
GardenHouse Plumbing Co
12200 RENFERT WAY UNIT G2

Replacement of building heating boilers only disconnect/reconnect gas line to replace

FinalMechanical PermitChange OutMay 2026
View Details
2026-063063 MP
Entech Sales & Service, LLC
12200 BARREL BND

Express: Foundation repair

FinalBuilding PermitRepairMay 2026
$1
View Details
2026-055731 BP
Douglas Foundation Repair

Watch all construction in 78724 (Austin)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.