Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Multi-Site Reception Area Remodel Milton Elementary School
2502 E ELM ST, Laredo, TX, 78043
Multi-Site Reception Area Remodel Milton Elementary School is a renovation/alteration project at 2502 E ELM ST, Laredo, in Webb County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Dec 2023 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $30K across about 200 sq ft.
- Estimated project value
- $30K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 200 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $150/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 6 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Scheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Source: TDLR filing
View source recordProject registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
15 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
164 days after the preceding date shown.
Source: TDLR filing
View source record
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78043 (Laredo)
One email per change. Unsubscribe in one click. Privacy.
Multi-Site Reception Area Remodel Milton Elementary School is a Renovation/Alteration project located at 2502 E ELM ST, Laredo, TX 78043 in Laredo, Texas. The project has an estimated value of $30K covering 200 sq ft. Laredo Independent School District is the property owner and Slay Architecture is the design firm of record. The project was registered with TDLR on July 18, 2023.
Frequently Asked Questions
What is Multi-Site Reception Area Remodel Milton Elementary School?
Multi-Site Reception Area Remodel Milton Elementary School is a renovation/alteration project at 2502 E ELM ST in Laredo, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodeling and addition of enclosure at existing reception area.
Is Multi-Site Reception Area Remodel Milton Elementary School open in Laredo?
Multi-Site Reception Area Remodel Milton Elementary School was scheduled to finish construction in Dec 2023 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Multi-Site Reception Area Remodel Milton Elementary School located?
Multi-Site Reception Area Remodel Milton Elementary School is located at 2502 E ELM ST, Laredo, TX, 78043, in Webb County.
Who is the owner or developer of Multi-Site Reception Area Remodel Milton Elementary School?
Laredo Independent School District is the property owner/developer of record for Multi-Site Reception Area Remodel Milton Elementary School, per its TDLR project registration.
Who is the architect or design firm for Multi-Site Reception Area Remodel Milton Elementary School?
Slay Architecture is the design firm of record for Multi-Site Reception Area Remodel Milton Elementary School, according to its TDLR filing.
How much does Multi-Site Reception Area Remodel Milton Elementary School cost and how big is it?
Multi-Site Reception Area Remodel Milton Elementary School has an estimated construction value of $30K and approximately 200 square feet (about $150/sqft), based on its TDLR filing.
Scope of Work
Remodeling and addition of enclosure at existing reception area.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
2502 E ELM ST, Laredo, TX, 78043
Related Projects
Same Owner
$6.85B totalWatch all construction in 78043 (Laredo)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Laredo?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.