Project intelligenceTDLR TABS2023024486Additions to Existing Building
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Brewer Middle School A&R - Package Three in White Settlement, TX

1000 S Cherry Ln, White Settlement, TX, 76108

Construction complete · Jan 2025Inspection Complete

Brewer Middle School A&R - Package Three is a additions to existing building project at 1000 S Cherry Ln, White Settlement, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2025). The project has an estimated value of $49.0M across about 101,285 sq ft.

Estimated project value
$49.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
101,285 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$484/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 3mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 26, 2023537 days across supplied datesJan 13, 2025

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    84 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    453 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76108 (White Settlement)

One email per change. Unsubscribe in one click. Privacy.

Brewer Middle School A&R - Package Three is a Additions to Existing Building project located at 1000 S Cherry Ln, White Settlement, TX 76108 in White Settlement, Texas. The project has an estimated value of $49.0M covering 101,285 sq ft. White Settlement ISD is the property owner and VLK Architects Inc is the design firm of record. The project was registered with TDLR on July 26, 2023.

Frequently Asked Questions

What is Brewer Middle School A&R - Package Three?

Brewer Middle School A&R - Package Three is a additions to existing building project at 1000 S Cherry Ln in White Settlement, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Additions and Renovations to the Middle School

Is Brewer Middle School A&R - Package Three open in White Settlement?

Construction on Brewer Middle School A&R - Package Three is complete — TDLR records show the project passed its required accessibility inspection in Jan 2025. The building is finished and very likely open.

Where is Brewer Middle School A&R - Package Three located?

Brewer Middle School A&R - Package Three is located at 1000 S Cherry Ln, White Settlement, TX, 76108, in Tarrant County.

Who is the owner or developer of Brewer Middle School A&R - Package Three?

White Settlement ISD is the property owner/developer of record for Brewer Middle School A&R - Package Three, per its TDLR project registration.

Who is the architect or design firm for Brewer Middle School A&R - Package Three?

VLK Architects Inc is the design firm of record for Brewer Middle School A&R - Package Three, according to its TDLR filing.

How much does Brewer Middle School A&R - Package Three cost and how big is it?

Brewer Middle School A&R - Package Three has an estimated construction value of $49.0M and approximately 101,285 square feet (about $484/sqft), based on its TDLR filing.

Scope of Work

Additions and Renovations to the Middle School

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1000 S Cherry Ln, White Settlement, TX, 76108

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 76108 (White Settlement)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in White Settlement?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.