Project intelligenceTDLR TABS2023025672Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Traffic Signal Improvements on Precinct Line Rd at Redbud Dr

433 Precinct Line Rd, Hurst, TX, 76053

Construction complete · Oct 2024Project Closed

Traffic Signal Improvements on Precinct Line Rd at Redbud Dr is a renovation/alteration project at 433 Precinct Line Rd, Hurst, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2024). The project has an estimated value of $59K across about 1,000 sq ft.

Estimated project value
$59K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$59/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 11, 2023417 days across supplied datesOct 1, 2024

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    51 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    366 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76053 (Hurst)

One email per change. Unsubscribe in one click. Privacy.

Traffic Signal Improvements on Precinct Line Rd at Redbud Dr is a Renovation/Alteration project located at 433 Precinct Line Rd, Hurst, TX 76053 in Hurst, Texas. The project has an estimated value of $59K covering 1,000 sq ft. City of Hurst is the property owner and Lee Engineering is the design firm of record. The project was registered with TDLR on August 11, 2023.

Frequently Asked Questions

What is Traffic Signal Improvements on Precinct Line Rd at Redbud Dr?

Traffic Signal Improvements on Precinct Line Rd at Redbud Dr is a renovation/alteration project at 433 Precinct Line Rd in Hurst, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Installation of a traffic signal and replacement of pedestrian curb ramps & sidewalk

Is Traffic Signal Improvements on Precinct Line Rd at Redbud Dr open in Hurst?

Construction on Traffic Signal Improvements on Precinct Line Rd at Redbud Dr is complete — TDLR records show the project passed its required accessibility inspection in Oct 2024. The building is finished and very likely open.

Where is Traffic Signal Improvements on Precinct Line Rd at Redbud Dr located?

Traffic Signal Improvements on Precinct Line Rd at Redbud Dr is located at 433 Precinct Line Rd, Hurst, TX, 76053, in Tarrant County.

Who is the owner or developer of Traffic Signal Improvements on Precinct Line Rd at Redbud Dr?

City of Hurst is the property owner/developer of record for Traffic Signal Improvements on Precinct Line Rd at Redbud Dr, per its TDLR project registration.

Who is the architect or design firm for Traffic Signal Improvements on Precinct Line Rd at Redbud Dr?

Lee Engineering is the design firm of record for Traffic Signal Improvements on Precinct Line Rd at Redbud Dr, according to its TDLR filing.

How much does Traffic Signal Improvements on Precinct Line Rd at Redbud Dr cost and how big is it?

Traffic Signal Improvements on Precinct Line Rd at Redbud Dr has an estimated construction value of $59K and approximately 1,000 square feet (about $59/sqft), based on its TDLR filing.

Scope of Work

Installation of a traffic signal and replacement of pedestrian curb ramps & sidewalk

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

433 Precinct Line Rd, Hurst, TX, 76053

Location by street address

Watch all construction in 76053 (Hurst)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.