Lake Worth Fire Station

6620 Charbonneau Rd, Fort Worth, TX, 76135

Construction complete · Jun 2025Inspection Complete

Lake Worth Fire Station is a new construction project at 6620 Charbonneau Rd, Fort Worth, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2025). The project has an estimated value of $14.0M across about 27,000 sq ft.

Estimated project value
$14.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
27,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$519/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 7mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 11, 2023660 days across supplied datesJun 1, 2025

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    82 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    578 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76135 (Fort Worth)

One email per change. Unsubscribe in one click. Privacy.

Lake Worth Fire Station is a New Construction project located at 6620 Charbonneau Rd, Fort Worth, TX 76135 in Fort Worth, Texas. The project has an estimated value of $14.0M covering 27,000 sq ft. City of Lake Worth is the property owner and Eikon Consulting Group is the design firm of record. The project was registered with TDLR on August 11, 2023.

Frequently Asked Questions

What is Lake Worth Fire Station?

Lake Worth Fire Station is a new construction project at 6620 Charbonneau Rd in Fort Worth, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New two story, four bay fire station with apparatus support spaces as well as 10 bunk rooms with living spaces.

Is Lake Worth Fire Station open in Fort Worth?

Construction on Lake Worth Fire Station is complete — TDLR records show the project passed its required accessibility inspection in Jun 2025. The building is finished and very likely open.

Where is Lake Worth Fire Station located?

Lake Worth Fire Station is located at 6620 Charbonneau Rd, Fort Worth, TX, 76135, in Tarrant County.

Who is the owner or developer of Lake Worth Fire Station?

City of Lake Worth is the property owner/developer of record for Lake Worth Fire Station, per its TDLR project registration.

Who is the architect or design firm for Lake Worth Fire Station?

Eikon Consulting Group is the design firm of record for Lake Worth Fire Station, according to its TDLR filing.

How much does Lake Worth Fire Station cost and how big is it?

Lake Worth Fire Station has an estimated construction value of $14.0M and approximately 27,000 square feet (about $519/sqft), based on its TDLR filing.

Scope of Work

New two story, four bay fire station with apparatus support spaces as well as 10 bunk rooms with living spaces.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

6620 Charbonneau Rd, Fort Worth, TX, 76135

Location by street address

Watch all construction in 76135 (Fort Worth)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Fort Worth?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.