Project intelligenceTDLR TABS2023025981New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Austin ISD - Williams ES Swing Campus

500 MAIRO ST, Austin, TX, 78748

Construction complete · Jan 2024Inspection Complete

Austin ISD - Williams ES Swing Campus is a new construction project at 500 MAIRO ST, Austin, in Austin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2024). The project has an estimated value of $1.2M across about 12,000 sq ft.

Estimated project value
$1.2M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
12,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$100/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 16, 2023168 days across supplied datesJan 31, 2024

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    85 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    83 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78748 (Austin)

One email per change. Unsubscribe in one click. Privacy.

Austin ISD - Williams ES Swing Campus is a New Construction project located at 500 MAIRO ST, Austin, TX 78748 in Austin, Texas. The project has an estimated value of $1.2M covering 12,000 sq ft. Austin Independent School District is the property owner. The project was registered with TDLR on August 16, 2023.

Frequently Asked Questions

What is Austin ISD - Williams ES Swing Campus?

Austin ISD - Williams ES Swing Campus is a new construction project at 500 MAIRO ST in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Installation of temporary portable buildings

Is Austin ISD - Williams ES Swing Campus open in Austin?

Construction on Austin ISD - Williams ES Swing Campus is complete — TDLR records show the project passed its required accessibility inspection in Jan 2024. The building is finished and very likely open.

Where is Austin ISD - Williams ES Swing Campus located?

Austin ISD - Williams ES Swing Campus is located at 500 MAIRO ST, Austin, TX, 78748, in Austin County.

Who is the owner or developer of Austin ISD - Williams ES Swing Campus?

Austin Independent School District is the property owner/developer of record for Austin ISD - Williams ES Swing Campus, per its TDLR project registration.

How much does Austin ISD - Williams ES Swing Campus cost and how big is it?

Austin ISD - Williams ES Swing Campus has an estimated construction value of $1.2M and approximately 12,000 square feet (about $100/sqft), based on its TDLR filing.

Scope of Work

Installation of temporary portable buildings

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

500 MAIRO ST, Austin, TX, 78748

Location by street address

Related City Permits

Building permits found at or near this location

500 E 6TH ST

OLD SIXTH - Demolition of non historic rear addition - Plumbing upgrades for shell building stubbed and capped pipes. Concurrent Review requested.

ActiveBuilding PermitRemodelOct 2026
View Details
2026-075290 BP
Zapalac/Reed (MAIN) Construction Company
500 E 6TH ST

Repair of existing exterior stair to make code compliant and provide a second means of egress for future second floor tenant

ActiveBuilding PermitRemodelOct 2026
View Details
2026-071704 BP
Zapalac/Reed (MAIN) Construction Company
5001 CREEKLINE DR

Tunnel; repair/replacement of (1) bathtub drain.

ActivePlumbing PermitRepairOct 2026
View Details
2026-130811 PP
TEXAS GRAND PLUMBING, LLC
500 PAMPA DR

Interior Renovation to accommodate Temporary Offices

ActivePlumbing PermitRemodelOct 2026
View Details
2026-089135 PP
STELLAR PLUMBING INC
5009 EASTON LN

Winedale 880-Q-L Is a New two-story single-family residence with (5) bedrooms (3) bathrooms an attached two-car garage and a covered entry porch and patio.

ActiveBuilding PermitNewOct 2026
View Details
2026-130086 BP
Meritage Homes Corp

Watch all construction in 78748 (Austin)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.