Bering Drive Mobility and Drainage Improvements
Bering Drive, Houston, TX, 77057
Bering Drive Mobility and Drainage Improvements is a new construction project at Bering Drive, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2026). The project has an estimated value of $5.0M across about 114,460 sq ft.
- Estimated project value
- $5.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 114,460 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $44/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 9 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
5 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
498 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
271 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
96 days after the preceding date shown.
Source: TDLR filing
View source record
Inspection Complete
Final inspection completed, awaiting project closure
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77057 (Houston)
One email per change. Unsubscribe in one click. Privacy.
Bering Drive Mobility and Drainage Improvements is a New Construction project located at Bering Drive, Houston, TX 77057 in Houston, Texas. The project has an estimated value of $5.0M covering 114,460 sq ft. St. George Place Redevelopment Authority / TIRZ 1 is the property owner and Gauge Engineering is the design firm of record. The project was registered with TDLR on August 23, 2023.
Frequently Asked Questions
What is Bering Drive Mobility and Drainage Improvements?
Bering Drive Mobility and Drainage Improvements is a new construction project at Bering Drive in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Fully reconstruct the roadway to convert it from an elevated asphalt roadway with roadside ditches to a curb and gutter concrete roadway with sidewalks. Improve the drainage with new upgraded storm sewer boxes.
Is Bering Drive Mobility and Drainage Improvements open in Houston?
Construction on Bering Drive Mobility and Drainage Improvements is complete — TDLR records show the project passed its required accessibility inspection in Jan 2026. The building is finished and very likely open.
Where is Bering Drive Mobility and Drainage Improvements located?
Bering Drive Mobility and Drainage Improvements is located at Bering Drive, Houston, TX, 77057, in Harris County.
Who is the owner or developer of Bering Drive Mobility and Drainage Improvements?
St. George Place Redevelopment Authority / TIRZ 1 is the property owner/developer of record for Bering Drive Mobility and Drainage Improvements, per its TDLR project registration.
Who is the architect or design firm for Bering Drive Mobility and Drainage Improvements?
Gauge Engineering is the design firm of record for Bering Drive Mobility and Drainage Improvements, according to its TDLR filing.
How much does Bering Drive Mobility and Drainage Improvements cost and how big is it?
Bering Drive Mobility and Drainage Improvements has an estimated construction value of $5.0M and approximately 114,460 square feet (about $44/sqft), based on its TDLR filing.
Scope of Work
Fully reconstruct the roadway to convert it from an elevated asphalt roadway with roadside ditches to a curb and gutter concrete roadway with sidewalks. Improve the drainage with new upgraded storm sewer boxes.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
Bering Drive, Houston, TX, 77057
Watch all construction in 77057 (Houston)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Houston?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.