SL 121 (CSJ: 2502-01-024)
SL 121 (CSJ: 2502-01-024) is a new construction project at From: IH 14 To: IH 35, Belton, in Bell County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jan 2030. The project has an estimated value of $1.3M across about 144,371 sq ft.
๐Project Metrics
TDLR #TABS2026026054Project Registered
Project has been registered with TDLR and is in pre-construction phase
SL 121 (CSJ: 2502-01-024) is a New Construction project located at From: IH 14 To: IH 35, Belton, TX 76513 in Belton, Texas. The project has an estimated value of $1.3M covering 144,371 sq ft. TxDOT District: Waco is the property owner and Gauge Engineering is the design firm of record. The project was registered with TDLR on July 23, 2026.
โFrequently Asked Questions
What is SL 121 (CSJ: 2502-01-024)?
SL 121 (CSJ: 2502-01-024) is a new construction project at From: IH 14 To: IH 35 in Belton, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Widen from 2 lanes to 4 lanes with raised median.
Is SL 121 (CSJ: 2502-01-024) open in Belton?
SL 121 (CSJ: 2502-01-024) is still under construction in Belton, TX, with an estimated completion of Jan 2030 according to its TDLR registration.
Where is SL 121 (CSJ: 2502-01-024) located?
SL 121 (CSJ: 2502-01-024) is located at From: IH 14 To: IH 35, Belton, TX, 76513, in Bell County.
Who is the owner or developer of SL 121 (CSJ: 2502-01-024)?
TxDOT District: Waco is the property owner/developer of record for SL 121 (CSJ: 2502-01-024), per its TDLR project registration.
Who is the architect or design firm for SL 121 (CSJ: 2502-01-024)?
Gauge Engineering is the design firm of record for SL 121 (CSJ: 2502-01-024), according to its TDLR filing.
How much does SL 121 (CSJ: 2502-01-024) cost and how big is it?
SL 121 (CSJ: 2502-01-024) has an estimated construction value of $1.3M and approximately 144,371 square feet (about $9/sqft), based on its TDLR filing.
๐Scope of Work
Widen from 2 lanes to 4 lanes with raised median.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jul 23, 2026
Review Complete
Inspection Complete
Closed
๐Related Projects
๐คSame Owner
$4.5M totalProperty Owner
Design Firm
Registered Accessibility Specialist
Bell County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Bell County
Find General Contractors in Bell