Project intelligenceTDLR TABS2026026054New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

SL 121 (CSJ: 2502-01-024)

From: IH 14 To: IH 35, Belton, TX, 76513

Opening ~Jan 2030Review Complete

SL 121 (CSJ: 2502-01-024) is a new construction project at From: IH 14 To: IH 35, Belton, in Bell County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jan 2030. The project has an estimated value of $1.3M across about 144,371 sq ft.

Estimated project value
$1.3M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
144,371 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$9/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 years
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 23, 20261,259 days across supplied datesJan 2, 2030

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    14 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    151 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    1,094 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About SL 121 (CSJ: 2502-01-024)

TxDOT District: Waco is widening State Highway 121 in Belton from two lanes to four, adding a raised median to the roadway. The project, filed as CSJ: 2502-01-024, covers a linear stretch of public land from IH 14 to IH 35 in Bell County. With an estimated cost of $1,309,324 and a measured area of 144,371 sq ft, the work represents a significant infrastructure investment for the region.

The scope of work involves new construction to improve traffic flow and safety along this major corridor. Gauge Engineering is the design firm of record for the project. Frank Fonseca is the registered accessibility specialist associated with the filing. The project is funded through public funds and involves Federally funded roadway improvements, ensuring compliance with state and federal standards for public infrastructure.

Timeline and Status

TDLR completed plan review in August 2026. Construction is scheduled to begin in January 2027 and is scheduled to finish in January 2030. This timeline reflects a build window of 1094 days, which is longer than the county median of 242 days for similar new construction filings. The TDLR status is listed as Review Complete, indicating that the planning phase has been successfully concluded before ground-breaking.

The estimated cost per square foot is $9, which is below the Bell County median of $150 per square foot for new construction projects. However, the total estimated cost of $1,309,324 is above the county median of $850,000 for comparable filings. This discrepancy highlights the difference between linear roadway projects and building-based construction in terms of cost density and scale.

Regional Context

Bell County has seen 211 TDLR-registered new construction projects in the last 24 months. TxDOT District: Waco has six other registered projects totaling $4,432,834 in the region, including work in Belton, Clifton, Waco, and Killeen. Gauge Engineering has also been involved in six other projects totaling $9,215,300, with work in League City, Houston, and other areas. This project fits within a broader pattern of infrastructure development across the state, driven by both local needs and federal funding opportunities.

The surrounding area, ZIP 76513, has a population of about 44,855 with a median household income of $82,366. The housing market is mostly owner-occupied, with a median home value of $260,200. These demographic and economic factors provide context for the community impact of the highway widening project.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76513 (Belton)

One email per change. Unsubscribe in one click. Privacy.

SL 121 (CSJ: 2502-01-024) is a New Construction project located at From: IH 14 To: IH 35, Belton, TX 76513 in Belton, Texas. The project has an estimated value of $1.3M covering 144,371 sq ft. TxDOT District: Waco is the property owner and Gauge Engineering is the design firm of record. The project was registered with TDLR on July 23, 2026.

Frequently Asked Questions

When will the highway widening start?

Construction is scheduled to begin in January 2027, following the completion of plan review in August 2026.

Who is the design firm for this project?

Gauge Engineering is the design firm of record for the State Highway 121 widening project in Belton.

What is the estimated cost of the project?

The estimated cost is $1,309,324, which is above the Bell County median for new construction filings.

How long will the construction take?

The scheduled build window is 1094 days, from January 2027 to January 2030.

What is SL 121 (CSJ: 2502-01-024)?

SL 121 (CSJ: 2502-01-024) is a new construction project at From: IH 14 To: IH 35 in Belton, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Widen from 2 lanes to 4 lanes with raised median.

Is SL 121 (CSJ: 2502-01-024) open in Belton?

SL 121 (CSJ: 2502-01-024) is still under construction in Belton, TX, with an estimated completion of Jan 2030 according to its TDLR registration.

Where is SL 121 (CSJ: 2502-01-024) located?

SL 121 (CSJ: 2502-01-024) is located at From: IH 14 To: IH 35, Belton, TX, 76513, in Bell County.

Who is the owner or developer of SL 121 (CSJ: 2502-01-024)?

TxDOT District: Waco is the property owner/developer of record for SL 121 (CSJ: 2502-01-024), per its TDLR project registration.

Who is the architect or design firm for SL 121 (CSJ: 2502-01-024)?

Gauge Engineering is the design firm of record for SL 121 (CSJ: 2502-01-024), according to its TDLR filing.

How much does SL 121 (CSJ: 2502-01-024) cost and how big is it?

SL 121 (CSJ: 2502-01-024) has an estimated construction value of $1.3M and approximately 144,371 square feet (about $9/sqft), based on its TDLR filing.

Scope of Work

Widen from 2 lanes to 4 lanes with raised median.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

From: IH 14 To: IH 35, Belton, TX, 76513

31.00846, -97.48765