Project intelligenceTDLR TABS2027001213New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

FM 93 (CSJ: 0015-05-052, etc.) in Belton, TX

From: SH 317 To: FM 817, Belton, TX, 76513

Opening ~Apr 2028Review Complete

FM 93 (CSJ: 0015-05-052, etc.) is a new construction project at From: SH 317 To: FM 817, Belton, in Bell County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Apr 2028. The project has an estimated value of $302K across about 24,560 sq ft.

Estimated project value
$302K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
24,560 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$12/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
9 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Sep 16, 2026567 days across supplied datesApr 5, 2028

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    13 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    279 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    275 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About FM 93 (CSJ: 0015-05-052, etc.)

TxDOT District: Waco is preparing to rehabilitate a section of Farm Road 93 in Belton, Texas, with work targeted for April 2028. The project, identified by filing number CSJ: 0015-05-052, involves new construction that spans a 24,560 sq ft area between State Highway 317 and Farm Road 817. The estimated cost for this roadway and pedestrian infrastructure update is $301,905.

The scope of work focuses on improving the existing roadway and adding necessary pedestrian amenities. Contractors will mill the existing asphalt and lay new pavement to restore the road surface. The plan also includes the construction of sidewalks and curb ramps to enhance accessibility for residents and travelers using this corridor in Bell County.

Project Status and Timeline

The project was registered with TDLR in September 2026. Plan review is pending, and the construction start is scheduled for July 2027. The entire build window is approximately 275 days, which is close to the county median of 242 days for similar new construction filings.

With an estimated cost of $301,905, this project sits below the Bell County median of $850,000 for new construction projects. The cost per square foot is calculated at $12, which is significantly lower than the county median of $151 per square foot. This efficiency reflects the nature of roadway rehabilitation and linear infrastructure work compared to large building structures.

Owner and Regional Context

TxDOT District: Waco is the owner of record for this project. The agency has six other TDLR-registered projects in the region, including work in Clifton, Waco, and Killeen, with a combined value exceeding $5.4 million. The local area, ZIP 76513, has a population of about 44,855 with a median household income of $82,366, according to U.S. Census ACS 2023 estimates. Housing in this area is mostly owner-occupied, with a median home value of $260,200.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76513 (Belton)

One email per change. Unsubscribe in one click. Privacy.

FM 93 (CSJ: 0015-05-052, etc.) is a New Construction project located at From: SH 317 To: FM 817, Belton, TX 76513 in Belton, Texas. The project has an estimated value of $302K covering 24,560 sq ft. TxDOT District: Waco is the property owner. The project was registered with TDLR on September 16, 2026.

Frequently Asked Questions

When will construction start on FM 93?

The filing indicates a construction start date of July 2027. The project was registered with TDLR in September 2026, and plan review is pending before construction can begin.

What is the total estimated cost for this project?

The estimated cost for the FM 93 rehabilitation and pedestrian infrastructure project is $301,905. This figure covers milling, asphalt pavement, sidewalks, and curb ramps over a 24,560 sq ft area.

Who is the registered accessibility specialist?

Frank Fonseca is the registered accessibility specialist listed for this project. He is responsible for ensuring the construction meets accessibility standards under TDLR regulations.

Is the project located in a flood zone?

It is designated as zone X on the FEMA National Flood Hazard Layer, indicating low risk of flooding.

How does the project size compare to other Bell County projects?

At 24,560 sq ft, this project is larger than the Bell County median of 6,600 sq ft for new construction. However, its cost per square foot is $12, well below the county median of $151.

What is FM 93 (CSJ: 0015-05-052, etc.)?

FM 93 (CSJ: 0015-05-052, etc.) is a new construction project at From: SH 317 To: FM 817 in Belton, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Rehabilitate existing roadway and construct pedestrian infrastructure consisting of milling, asphalt pavement, sidewalks and curb ramps.

Is FM 93 (CSJ: 0015-05-052, etc.) open in Belton?

FM 93 (CSJ: 0015-05-052, etc.) is still under construction in Belton, TX, with an estimated completion of Apr 2028 according to its TDLR registration.

Where is FM 93 (CSJ: 0015-05-052, etc.) located?

FM 93 (CSJ: 0015-05-052, etc.) is located at From: SH 317 To: FM 817, Belton, TX, 76513, in Bell County.

Who is the owner or developer of FM 93 (CSJ: 0015-05-052, etc.)?

TxDOT District: Waco is the property owner/developer of record for FM 93 (CSJ: 0015-05-052, etc.), per its TDLR project registration.

How much does FM 93 (CSJ: 0015-05-052, etc.) cost and how big is it?

FM 93 (CSJ: 0015-05-052, etc.) has an estimated construction value of $302K and approximately 24,560 square feet (about $12/sqft), based on its TDLR filing.

Scope of Work

Rehabilitate existing roadway and construct pedestrian infrastructure consisting of milling, asphalt pavement, sidewalks and curb ramps.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

From: SH 317 To: FM 817, Belton, TX, 76513

Loading location map…
31.00817, -97.43144

Watch all construction in 76513 (Belton)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.