Project intelligenceTDLR TABS2023026789Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

UTMB G20 Grant Submission:Addition of Drains to BSL3E Animal Rooms in Galveston, TX

221 9th Street, Galveston, TX, 77555

Target date passed (May 2024)Review Complete

UTMB G20 Grant Submission:Addition of Drains to BSL3E Animal Rooms is a renovation/alteration project at 221 9th Street, Galveston, in Galveston County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish May 2024 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $999K across about 592 sq ft.

Estimated project value
$999K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
592 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$1.69K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
5 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 25, 2023250 days across supplied datesMay 1, 2024

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    98 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    152 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77555 (Galveston)

One email per change. Unsubscribe in one click. Privacy.

UTMB G20 Grant Submission:Addition of Drains to BSL3E Animal Rooms is a Renovation/Alteration project located at 221 9th Street, Galveston, TX 77555 in Galveston, Texas. The project has an estimated value of $999K covering 592 sq ft. UTMB is the property owner and Perkins&Will is the design firm of record. The project was registered with TDLR on August 25, 2023.

Frequently Asked Questions

What is UTMB G20 Grant Submission:Addition of Drains to BSL3E Animal Rooms?

UTMB G20 Grant Submission:Addition of Drains to BSL3E Animal Rooms is a renovation/alteration project at 221 9th Street in Galveston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of Galveston National Laboratory Level 2, Including the addition of floor drains at two animal holding rooms in the BSL-3E Laboratory

Is UTMB G20 Grant Submission:Addition of Drains to BSL3E Animal Rooms open in Galveston?

UTMB G20 Grant Submission:Addition of Drains to BSL3E Animal Rooms was scheduled to finish construction in May 2024 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is UTMB G20 Grant Submission:Addition of Drains to BSL3E Animal Rooms located?

UTMB G20 Grant Submission:Addition of Drains to BSL3E Animal Rooms is located at 221 9th Street, Galveston, TX, 77555, in Galveston County.

Who is the owner or developer of UTMB G20 Grant Submission:Addition of Drains to BSL3E Animal Rooms?

UTMB is the property owner/developer of record for UTMB G20 Grant Submission:Addition of Drains to BSL3E Animal Rooms, per its TDLR project registration.

Who is the architect or design firm for UTMB G20 Grant Submission:Addition of Drains to BSL3E Animal Rooms?

Perkins&Will is the design firm of record for UTMB G20 Grant Submission:Addition of Drains to BSL3E Animal Rooms, according to its TDLR filing.

How much does UTMB G20 Grant Submission:Addition of Drains to BSL3E Animal Rooms cost and how big is it?

UTMB G20 Grant Submission:Addition of Drains to BSL3E Animal Rooms has an estimated construction value of $999K and approximately 592 square feet (about $1.69K/sqft), based on its TDLR filing.

Scope of Work

Renovation of Galveston National Laboratory Level 2, Including the addition of floor drains at two animal holding rooms in the BSL-3E Laboratory

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

221 9th Street, Galveston, TX, 77555

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77555 (Galveston)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Galveston?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.