Mt. Carmel Baptist Church Addition & Renovation

400 Q.S. Goins lane, Elgin, TX, 78621

Construction complete · Jun 2024Project Closed

Mt. Carmel Baptist Church Addition & Renovation is a renovation/alteration project at 400 Q.S. Goins lane, Elgin, in Bastrop County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2024). The project has an estimated value of $980K across about 7,200 sq ft.

Estimated project value
$980K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
7,200 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$136/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
6 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 11, 2023234 days across supplied datesJun 1, 2024

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    50 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    184 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

📰About Mt. Carmel Baptist Church Addition & Renovation

Mt. Carmel Baptist Church completed a $980,000 renovation and addition project at 400 Q.S. Goins Lane in Elgin, Texas. The work expanded the existing structure by 7,200 square feet, bringing the total estimated cost to $136 per square foot. This privately funded project on private land focused on altering and expanding the church facilities.

The construction process began in November 2023, following the project's registration with the Texas Department of Licensing and Regulation (TDLR) in October 2023. The scheduled build window lasted 184 days, which is longer than the 97-day median for similar renovation filings in Bastrop County. The project concluded in June 2024, marking the end of the active construction phase.

Design and Construction Details

Cutright & Prihoda, Inc. served as the design firm of record for this project. This firm has registered six other projects with TDLR, totaling $6,800,000 in estimated costs across various locations in Texas, including Schulenburg, Smithville, and Round Top. The scope of work for the Elgin project was specifically designated as an addition and renovation to the church, distinct from new ground-up construction.

In the context of Bastrop County construction activity, this project's cost is above the county median of $300,000 for renovation and alteration filings. It falls within the top quarter of costs for its type in the region.

TDLR closed the project file in June 2024, which marks the end of the accessibility review process for this construction. The record reflects a completed schedule with no pending extensions or open violations noted in the filing data. The project stands as a significant infrastructure investment for the local community, adding substantial square footage to the existing church property.

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78621 (Elgin)

One email per change. Unsubscribe in one click. Privacy.

Mt. Carmel Baptist Church Addition & Renovation is a Renovation/Alteration project located at 400 Q.S. Goins lane, Elgin, TX 78621 in Elgin, Texas. The project has an estimated value of $980K covering 7,200 sq ft. Mt. Carmel Baptist Church is the property owner and Cutright & Prihoda, Inc. is the design firm of record. The project was registered with TDLR on October 11, 2023.

Frequently Asked Questions

Is Mt. Carmel Baptist Church open?

The TDLR record confirms the construction project was completed and the file was closed in June 2024. It does not provide information regarding the business's current operating hours or public access status.

Who designed the Mt. Carmel Baptist Church addition?

Cutright & Prihoda, Inc. is listed as the design firm of record for the $980,000 renovation and addition project in Elgin.

How much did the church renovation cost?

The estimated cost for the 7,200 square foot addition and renovation was $980,000, resulting in a cost of $136 per square foot.

When did the construction finish?

Construction started in November 2023, and the TDLR project file was closed in June 2024, indicating the completion of the scheduled work.

What is Mt. Carmel Baptist Church Addition & Renovation?

Mt. Carmel Baptist Church Addition & Renovation is a renovation/alteration project at 400 Q.S. Goins lane in Elgin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Addition and Renovation to Church

Is Mt. Carmel Baptist Church Addition & Renovation open in Elgin?

Construction on Mt. Carmel Baptist Church Addition & Renovation is complete — TDLR records show the project passed its required accessibility inspection in Jun 2024. The building is finished and very likely open.

Where is Mt. Carmel Baptist Church Addition & Renovation located?

Mt. Carmel Baptist Church Addition & Renovation is located at 400 Q.S. Goins lane, Elgin, TX, 78621, in Bastrop County.

Who is the owner or developer of Mt. Carmel Baptist Church Addition & Renovation?

Mt. Carmel Baptist Church is the property owner/developer of record for Mt. Carmel Baptist Church Addition & Renovation, per its TDLR project registration.

Who is the architect or design firm for Mt. Carmel Baptist Church Addition & Renovation?

Cutright & Prihoda, Inc. is the design firm of record for Mt. Carmel Baptist Church Addition & Renovation, according to its TDLR filing.

How much does Mt. Carmel Baptist Church Addition & Renovation cost and how big is it?

Mt. Carmel Baptist Church Addition & Renovation has an estimated construction value of $980K and approximately 7,200 square feet (about $136/sqft), based on its TDLR filing.

Scope of Work

Addition and Renovation to Church

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Related City Permits

Building permits found at or near this location

4001 GALACIA DR

BASE: Installing a backup battery system and additional meter socket.

ActiveElectrical PermitAuxiliary PowerSep 2026
View Details
2026-108904 EP
Base Power
4006 NORTH HILLS DR

Tunnel under foundation to replace cast iron drain lines for primary bathroom and hall bathroom only. Two access holes: one on right side of home second in back left side of home. Tunnel approx. 50 ft. Sewer line replaced from home to city tap connection. Sewer line approx. 45 ft.

ActivePlumbing PermitRepairSep 2026
View Details
2026-114457 PP
Calixto Plumbing
400 GROVE BLVD

Install (1) 2-bay swing with shade with 4 tot seats. Install (1) 3- bay with shade with (6) belt seats.

ActiveBuilding PermitRemodelSep 2026
View Details
2026-107809 BP
Premier Outdoor Installations
400 W 15TH ST

7 DAY - Addition of outdoor natural gas standby generator at existing business - OVA

ActivePlumbing PermitRemodelSep 2026
View Details
2026-035058 PP
Michalek Plumbing
4005 BISCAY DR

ePlan: Residential Expedited Review - Interior Remodel to Existing 1-Story Single Family Res. [4bed 2bath] Work to include: Reconfiguration of Living Kitchen Mud Office Bath. Replacement of Doors/Windows.

ActivePlumbing PermitRemodelAug 2026
View Details
2026-108322 PP
Phil's Easy Flow

Watch all construction in 78621 (Elgin)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Get alerts for Bastrop

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists