Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
MVISD HS2 - New High School - Pkg 1 in San Antonio, TX
308 CR 381, San Antonio, TX, 78523
MVISD HS2 - New High School - Pkg 1 is a new construction project at 308 CR 381, San Antonio, in Medina County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2026). The project has an estimated value of $22.0M across about 435,000 sq ft.
- Estimated project value
- $22.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 435,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $51/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2y 7mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
5 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
20 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
943 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
110 days after the preceding date shown.
Source: TDLR filing
View source record
📰About MVISD HS2 - New High School - Pkg 1
The new high school for Medina Valley ISD, located at 308 CR 381 in San Antonio, is complete. The building passed its final TDLR accessibility inspection in September 2026, confirming that construction is finished. This project, filed as MVISD HS2 - New High School - Pkg 1, represents a significant addition to the local educational infrastructure in Medina County.
Project Scope and Scale
The facility covers 435,000 sq ft of new construction. The estimated cost for the project was $22,000,000, resulting in a computed cost of $51 per square foot. The scope of work included sitework, piers, and bus access for the high school building. This size and cost profile place the project in the top quarter of estimated costs among 128 TDLR-registered new construction filings in Medina County, while the per-square-foot cost remains below the county median of $200.
Medina Valley ISD is the owner of record, with O'Connell Robertson serving as the design firm. The project was registered with TDLR in October 2023, and plan review was completed in the same month. Construction started in November 2023, with a scheduled completion date of June 2026. The final inspection was passed in September 2026, and the TDLR status is now Inspection Complete.
Context and Comparisons
Medina Valley ISD has six other TDLR-registered projects totaling $340,436,107, including the MVISD Middle School #3 and Medina Valley High School AG-JROTC Building. O'Connell Robertson has been the design firm for six other projects totaling $38,034,222, such as the University Health - SKY Tower in San Antonio. The scheduled build window for this project was 943 days, which is longer than the county median of 291 days for similar new construction filings.
City of San Antonio permit records show four electrical general permits issued at this street address between May 2025 and May 2025, with Lanier Electrical, LLC listed as the contractor for these permits. A Facebook post by Bartlett Cocke General Contractors mentioned the MVISD new high school in the context of hiring in San Antonio, while another post by LMHeiferCreations referenced the new high school in relation to handmade goods for the school community.
Inspection Complete
Final inspection completed, awaiting project closure
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78523 (San Antonio)
One email per change. Unsubscribe in one click. Privacy.
MVISD HS2 - New High School - Pkg 1 is a New Construction project located at 308 CR 381, San Antonio, TX 78523 in San Antonio, Texas. The project has an estimated value of $22.0M covering 435,000 sq ft. Medina Valley ISD is the property owner and O'Connell Robertson is the design firm of record. The project was registered with TDLR on October 12, 2023.
Frequently Asked Questions
Is the construction complete?
Yes, the project is complete. The building passed its final TDLR accessibility inspection in September 2026, and the TDLR status is Inspection Complete.
Who is the owner of the project?
Medina Valley ISD is the owner of record for the new high school project in San Antonio.
What is the size of the new high school?
The new high school building covers 435,000 sq ft of new construction space.
Who was the design firm?
O'Connell Robertson was the design firm of record for the MVISD new high school project.
What is MVISD HS2 - New High School - Pkg 1?
MVISD HS2 - New High School - Pkg 1 is a new construction project at 308 CR 381 in San Antonio, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Sitework, piers and bus access for 435,000 sf high school building.
Is MVISD HS2 - New High School - Pkg 1 open in San Antonio?
Construction on MVISD HS2 - New High School - Pkg 1 is complete — TDLR records show the project passed its required accessibility inspection in Sep 2026. The building is finished and very likely open.
Where is MVISD HS2 - New High School - Pkg 1 located?
MVISD HS2 - New High School - Pkg 1 is located at 308 CR 381, San Antonio, TX, 78523, in Medina County.
Who is the owner or developer of MVISD HS2 - New High School - Pkg 1?
Medina Valley ISD is the property owner/developer of record for MVISD HS2 - New High School - Pkg 1, per its TDLR project registration.
Who is the architect or design firm for MVISD HS2 - New High School - Pkg 1?
O'Connell Robertson is the design firm of record for MVISD HS2 - New High School - Pkg 1, according to its TDLR filing.
How much does MVISD HS2 - New High School - Pkg 1 cost and how big is it?
MVISD HS2 - New High School - Pkg 1 has an estimated construction value of $22.0M and approximately 435,000 square feet (about $51/sqft), based on its TDLR filing.
Scope of Work
Sitework, piers and bus access for 435,000 sf high school building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
308 CR 381, San Antonio, TX, 78523
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$501.5M totalWatch all construction in 78523 (San Antonio)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in San Antonio?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.