Project intelligenceTDLR TABS2024004665New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Sienna Bees Creek Section 31

4100 1/2 Sienna Parkway, Missouri City, TX, 77459

Construction complete · May 2024Project Closed

Sienna Bees Creek Section 31 is a new construction project at 4100 1/2 Sienna Parkway, Missouri City, in Fort Bend County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2024). The project has an estimated value of $500K across about 189,560 sq ft.

Estimated project value
$500K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
189,560 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$3/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 3, 2023180 days across supplied datesMay 1, 2024

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    61 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    119 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77459 (Missouri City)

One email per change. Unsubscribe in one click. Privacy.

Sienna Bees Creek Section 31 is a New Construction project located at 4100 1/2 Sienna Parkway, Missouri City, TX 77459 in Missouri City, Texas. The project has an estimated value of $500K covering 189,560 sq ft. Sienna MUD c/o PHHOU-Sienna 34, LLC is the property owner and TBG is the design firm of record. The project was registered with TDLR on November 3, 2023.

Frequently Asked Questions

What is Sienna Bees Creek Section 31?

Sienna Bees Creek Section 31 is a new construction project at 4100 1/2 Sienna Parkway in Missouri City, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Installation of concrete sidewalks, landscape enhancements, and irrigation

Is Sienna Bees Creek Section 31 open in Missouri City?

Construction on Sienna Bees Creek Section 31 is complete — TDLR records show the project passed its required accessibility inspection in May 2024. The building is finished and very likely open.

Where is Sienna Bees Creek Section 31 located?

Sienna Bees Creek Section 31 is located at 4100 1/2 Sienna Parkway, Missouri City, TX, 77459, in Fort Bend County.

Who is the owner or developer of Sienna Bees Creek Section 31?

Sienna MUD c/o PHHOU-Sienna 34, LLC is the property owner/developer of record for Sienna Bees Creek Section 31, per its TDLR project registration.

Who is the architect or design firm for Sienna Bees Creek Section 31?

TBG is the design firm of record for Sienna Bees Creek Section 31, according to its TDLR filing.

How much does Sienna Bees Creek Section 31 cost and how big is it?

Sienna Bees Creek Section 31 has an estimated construction value of $500K and approximately 189,560 square feet (about $3/sqft), based on its TDLR filing.

Scope of Work

Installation of concrete sidewalks, landscape enhancements, and irrigation

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

4100 1/2 Sienna Parkway, Missouri City, TX, 77459

Location by street address

Watch all construction in 77459 (Missouri City)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Missouri City?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.