Databank HU3 4MW Fitout is a renovation/alteration project at 11003 Corporate Centre Dr., Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2026). The project has an estimated value of $10.0M across about 25,000 sq ft.
Project has been completed and closed
Databank HU3 4MW Fitout is a Renovation/Alteration project located at 11003 Corporate Centre Dr., Houston, TX 77041 in Houston, Texas. The project has an estimated value of $10.0M covering 25,000 sq ft. Data Center Houston, LLC is the property owner and Corgan is the design firm of record. The project was registered with TDLR on November 17, 2023.
Databank HU3 4MW Fitout is a renovation/alteration project at 11003 Corporate Centre Dr. in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 4MW of power will be added to an existing data center in Houston, Texas. Electrical rooms will get populated, and galleries will have additional equipment installed.
Construction on Databank HU3 4MW Fitout is complete โ TDLR records show the project passed its required accessibility inspection in May 2026. The building is finished and very likely open.
Databank HU3 4MW Fitout is located at 11003 Corporate Centre Dr., Houston, TX, 77041, in Harris County.
Data Center Houston, LLC is the property owner/developer of record for Databank HU3 4MW Fitout, per its TDLR project registration.
Corgan is the design firm of record for Databank HU3 4MW Fitout, according to its TDLR filing.
Databank HU3 4MW Fitout has an estimated construction value of $10.0M and approximately 25,000 square feet (about $400/sqft), based on its TDLR filing.
4MW of power will be added to an existing data center in Houston, Texas. Electrical rooms will get populated, and galleries will have additional equipment installed.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Nov 17, 2023
Review Complete
Mar 13, 2026
Inspection Complete
Apr 1, 2026
Closed
May 14, 2026
19d
Construction phase