Cintas Renovation is a renovation/alteration project at 4301 Cambridge Suite B, Fort Worth, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2026). The project has an estimated value of $1.1M across about 22,096 sq ft.
Final inspection completed, awaiting project closure
Cintas Renovation is a Renovation/Alteration project located at 4301 Cambridge Suite B, Fort Worth, TX 76155 in Fort Worth, Texas. The project has an estimated value of $1.1M covering 22,096 sq ft. Cambridge EPA, LLC is the property owner and McGregor Murphy Architecture is the design firm of record. The project was registered with TDLR on November 30, 2023.
Cintas Renovation is a renovation/alteration project at 4301 Cambridge Suite B in Fort Worth, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior Remodel of existing building and warehouse space for a new tenant. Existing restroom to remain.
Construction on Cintas Renovation is complete โ TDLR records show the project passed its required accessibility inspection in Feb 2026. The building is finished and very likely open.
Cintas Renovation is located at 4301 Cambridge Suite B, Fort Worth, TX, 76155, in Tarrant County.
Cambridge EPA, LLC is the property owner/developer of record for Cintas Renovation, per its TDLR project registration.
McGregor Murphy Architecture is the design firm of record for Cintas Renovation, according to its TDLR filing.
Cintas Renovation has an estimated construction value of $1.1M and approximately 22,096 square feet (about $50/sqft), based on its TDLR filing.
Interior Remodel of existing building and warehouse space for a new tenant. Existing restroom to remain.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Nov 30, 2023
Review Complete
Nov 30, 2023
Inspection Complete
Feb 12, 2026
Closed
805d
Construction phase