Project intelligenceTDLR TABS2024006429New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

US 67 at FM 56 (CSJ: 0259-03-061) in Glen Rose, TX

US 67/FM 56 Intersection, Glen Rose, TX, 76043

Construction complete · Jul 2023Inspection Complete

US 67 at FM 56 (CSJ: 0259-03-061) is a new construction project at US 67/FM 56 Intersection, Glen Rose, in Somervell County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2023). The project has an estimated value of $68K across about 1,434 sq ft.

Estimated project value
$68K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,434 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$47/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
6 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 4, 2023331 days across supplied datesDec 1, 2023

4 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    178 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  4. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    153 days after the preceding date shown.

    Source: TDLR filing

    View source record

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76043 (Glen Rose)

One email per change. Unsubscribe in one click. Privacy.

US 67 at FM 56 (CSJ: 0259-03-061) is a New Construction project located at US 67/FM 56 Intersection, Glen Rose, TX 76043 in Glen Rose, Texas. The project has an estimated value of $68K covering 1,434 sq ft. TxDOT District: Fort Worth is the property owner and HDR, Inc is the design firm of record. The project was registered with TDLR on December 1, 2023.

Frequently Asked Questions

What is US 67 at FM 56 (CSJ: 0259-03-061)?

US 67 at FM 56 (CSJ: 0259-03-061) is a new construction project at US 67/FM 56 Intersection in Glen Rose, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of safety lighting and sidewalks.

Is US 67 at FM 56 (CSJ: 0259-03-061) open in Glen Rose?

Construction on US 67 at FM 56 (CSJ: 0259-03-061) is complete — TDLR records show the project passed its required accessibility inspection in Jul 2023. The building is finished and very likely open.

Where is US 67 at FM 56 (CSJ: 0259-03-061) located?

US 67 at FM 56 (CSJ: 0259-03-061) is located at US 67/FM 56 Intersection, Glen Rose, TX, 76043, in Somervell County.

Who is the owner or developer of US 67 at FM 56 (CSJ: 0259-03-061)?

TxDOT District: Fort Worth is the property owner/developer of record for US 67 at FM 56 (CSJ: 0259-03-061), per its TDLR project registration.

Who is the architect or design firm for US 67 at FM 56 (CSJ: 0259-03-061)?

HDR, Inc is the design firm of record for US 67 at FM 56 (CSJ: 0259-03-061), according to its TDLR filing.

How much does US 67 at FM 56 (CSJ: 0259-03-061) cost and how big is it?

US 67 at FM 56 (CSJ: 0259-03-061) has an estimated construction value of $68K and approximately 1,434 square feet (about $47/sqft), based on its TDLR filing.

Scope of Work

Construction of safety lighting and sidewalks.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

US 67/FM 56 Intersection, Glen Rose, TX, 76043

Loading location map…
32.22758, -97.77241

Watch all construction in 76043 (Glen Rose)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Glen Rose?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.