IH 40 (CSJ: 0090-05-107)
IH 40 (CSJ: 0090-05-107) is a new construction project at At Hope Road, Amarillo, in Potter County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2025). The project has an estimated value of $11.3M across about 831 sq ft.
๐Project Metrics
TDLR #TABS2024007487Inspection Complete
Final inspection completed, awaiting project closure
IH 40 (CSJ: 0090-05-107) is a New Construction project located at At Hope Road, Amarillo, TX 79110 in Amarillo, Texas. The project has an estimated value of $11.3M covering 831 sq ft. TxDOT District: Amarillo is the property owner and Bridgefarmer is the design firm of record. The project was registered with TDLR on December 15, 2023.
โFrequently Asked Questions
What is IH 40 (CSJ: 0090-05-107)?
IH 40 (CSJ: 0090-05-107) is a new construction project at At Hope Road in Amarillo, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replace existing bridge over IH 40 at Hope Road.
Is IH 40 (CSJ: 0090-05-107) open in Amarillo?
Construction on IH 40 (CSJ: 0090-05-107) is complete โ TDLR records show the project passed its required accessibility inspection in Apr 2025. The building is finished and very likely open.
Where is IH 40 (CSJ: 0090-05-107) located?
IH 40 (CSJ: 0090-05-107) is located at At Hope Road, Amarillo, TX, 79110, in Potter County.
Who is the owner or developer of IH 40 (CSJ: 0090-05-107)?
TxDOT District: Amarillo is the property owner/developer of record for IH 40 (CSJ: 0090-05-107), per its TDLR project registration.
Who is the architect or design firm for IH 40 (CSJ: 0090-05-107)?
Bridgefarmer is the design firm of record for IH 40 (CSJ: 0090-05-107), according to its TDLR filing.
How much does IH 40 (CSJ: 0090-05-107) cost and how big is it?
IH 40 (CSJ: 0090-05-107) has an estimated construction value of $11.3M and approximately 831 square feet (about $13.60K/sqft), based on its TDLR filing.
๐Scope of Work
Replace existing bridge over IH 40 at Hope Road.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Dec 15, 2023
Review Complete
Inspection Complete
Apr 1, 2025
Closed
๐Related Projects
Property Owner
Design Firm
Registered Accessibility Specialist
Potter County Economy
Explore Area
Find Professionals
Need a contractor for this project?
Browse verified general contractors active in Potter County
Find General Contractors in Potter