Project intelligenceTDLR TABS2024009368New Construction
Funding type

This project is privately funded, on private land for private use.

EVC System Installation in Manvel, TX

17510 Morris Ave C, Manvel, TX, 77578

Construction complete · Jan 2024Project Closed

EVC System Installation is a new construction project at 17510 Morris Ave C, Manvel, in Brazoria County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2024). The project has an estimated value of $730K across about 2,100 sq ft.

Estimated project value
$730K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
2,100 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$348/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 2, 2023121 days across supplied datesJan 31, 2024

4 timeline dates shown.

  1. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Source: TDLR filing

    View source record
  2. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    106 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    15 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77578 (Manvel)

One email per change. Unsubscribe in one click. Privacy.

EVC System Installation is a New Construction project located at 17510 Morris Ave C, Manvel, TX 77578 in Manvel, Texas. The project has an estimated value of $730K covering 2,100 sq ft. Texas Petroleum Group is the property owner and Interplan Architects is the design firm of record. The project was registered with TDLR on January 16, 2024.

Frequently Asked Questions

What is EVC System Installation?

EVC System Installation is a new construction project at 17510 Morris Ave C in Manvel, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Installation of infrastructure and equipment for Electric vehicle charging

Is EVC System Installation open in Manvel?

Construction on EVC System Installation is complete — TDLR records show the project passed its required accessibility inspection in Jan 2024. The building is finished and very likely open.

Where is EVC System Installation located?

EVC System Installation is located at 17510 Morris Ave C, Manvel, TX, 77578, in Brazoria County.

Who is the owner or developer of EVC System Installation?

Texas Petroleum Group is the property owner/developer of record for EVC System Installation, per its TDLR project registration.

Who is the architect or design firm for EVC System Installation?

Interplan Architects is the design firm of record for EVC System Installation, according to its TDLR filing.

How much does EVC System Installation cost and how big is it?

EVC System Installation has an estimated construction value of $730K and approximately 2,100 square feet (about $348/sqft), based on its TDLR filing.

Scope of Work

Installation of infrastructure and equipment for Electric vehicle charging

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

17510 Morris Ave C, Manvel, TX, 77578

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77578 (Manvel)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.