Project intelligenceTDLR TABS2024009866New Construction
Funding type

This project is privately funded, on private land for private use.

Park Blvd. Improvements from Country Club Rd. to Parker Rd. in Wylie, TX

Park Blvd. between Country Club Rd. and Parker Rd., Wylie, TX, 75098

Opening ~Dec 2027Review Complete

Park Blvd. Improvements from Country Club Rd. to Parker Rd. is a new construction project at Park Blvd. between Country Club Rd. and Parker Rd., Wylie, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2027. The project has an estimated value of $11.8M across about 156,000 sq ft.

Estimated project value
$11.8M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
156,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$76/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3y 5mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 23, 20241,438 days across supplied datesDec 31, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    221 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    1,217 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Park Blvd. Improvements from Country Club Rd. to Parker Rd.

Park Blvd. Improvements from Country Club Rd. to Parker Rd. is a new construction project in Wylie. The City of Wylie is constructing approximately 6,500 linear feet of 24-foot-wide concrete pavement along this corridor. The project covers 156,000 square feet of roadway and associated infrastructure. The registered accessibility specialist for the project is Casey Joe Anderson.

Teague Nall & Perkins, Inc. serves as the design firm of record for Park Blvd. Improvements from Country Club Rd. to Parker Rd. The scope includes water line, storm drain, lighting, trail, and sidewalk improvements. The estimated cost for the project is $11,800,000. TDLR completed plan review in January 2024, and construction is scheduled to finish in December 2027, with work starting August 2024.

Project Scale and Cost Context

The estimated cost of $11,800,000 is above the county median for new construction filings in Collin County. The median estimated cost for such projects in the county is $800,000. This project's cost falls in the top quarter of recent filings. The calculated cost per square foot is $76, which is below the county median of $120 per square foot.

The scheduled build window is 1,217 days. This is longer than the county median build window of 212 days for similar new construction projects. The City of Wylie has six other TDLR-registered projects totaling $10,805,173. These include the Wylie Downtown Phase 1 and the Wylie Senior Recreation Center.

Local Area and Funding

The project is located in Wylie, Collin County. Census estimates for the 75098 ZIP code indicate a population of about 67,513 residents. The median household income in this area is $115,587. There are approximately 22,080 housing units, with a median owner-occupied home value of $362,900. Housing in this area is predominantly owner-occupied.

According to the project filing, this work is privately funded, on private land for private use. The TDLR status for this registration is Review Complete. Construction began in August 2024. The final completion date on the filing is December 2027.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75098 (Wylie)

One email per change. Unsubscribe in one click. Privacy.

Park Blvd. Improvements from Country Club Rd. to Parker Rd. is a New Construction project located at Park Blvd. between Country Club Rd. and Parker Rd., Wylie, TX 75098 in Wylie, Texas. The project has an estimated value of $11.8M covering 156,000 sq ft. City of Wylie is the property owner and Teague Nall & Perkins, Inc. is the design firm of record. The project was registered with TDLR on January 23, 2024.

Frequently Asked Questions

What is the scope of the Park Blvd. improvements?

The project involves constructing 6,500 linear feet of 24-foot-wide concrete pavement. It also includes water line, storm drain, lighting, trail, and sidewalk improvements along the corridor.

Who is the owner and design firm?

The City of Wylie is the owner of record. Teague Nall & Perkins, Inc. is the design firm of record for this construction project.

When is the project scheduled to finish?

Construction started in August 2024. The project is scheduled to finish in December 2027. TDLR completed plan review in January 2024.

How does the cost compare to other projects?

The $11,800,000 estimated cost is above the Collin County median of $800,000. The cost per square foot is $76, which is below the county median of $120.

Is the business open?

The TDLR record indicates construction status. It does not indicate that a business is open or operating. The project is scheduled to finish in December 2027.

What is Park Blvd. Improvements from Country Club Rd. to Parker Rd.?

Park Blvd. Improvements from Country Club Rd. to Parker Rd. is a new construction project at Park Blvd. between Country Club Rd. and Parker Rd. in Wylie, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construct approximately 6,500 linear feet of 24' wide concrete pavement. The project includes water line, storm drain, lighting, trail, and sidewalk improvements.

Is Park Blvd. Improvements from Country Club Rd. to Parker Rd. open in Wylie?

Park Blvd. Improvements from Country Club Rd. to Parker Rd. is still under construction in Wylie, TX, with an estimated completion of Dec 2027 according to its TDLR registration.

Where is Park Blvd. Improvements from Country Club Rd. to Parker Rd. located?

Park Blvd. Improvements from Country Club Rd. to Parker Rd. is located at Park Blvd. between Country Club Rd. and Parker Rd., Wylie, TX, 75098, in Collin County.

Who is the owner or developer of Park Blvd. Improvements from Country Club Rd. to Parker Rd.?

City of Wylie is the property owner/developer of record for Park Blvd. Improvements from Country Club Rd. to Parker Rd., per its TDLR project registration.

Who is the architect or design firm for Park Blvd. Improvements from Country Club Rd. to Parker Rd.?

Teague Nall & Perkins, Inc. is the design firm of record for Park Blvd. Improvements from Country Club Rd. to Parker Rd., according to its TDLR filing.

How much does Park Blvd. Improvements from Country Club Rd. to Parker Rd. cost and how big is it?

Park Blvd. Improvements from Country Club Rd. to Parker Rd. has an estimated construction value of $11.8M and approximately 156,000 square feet (about $76/sqft), based on its TDLR filing.

Scope of Work

Construct approximately 6,500 linear feet of 24' wide concrete pavement. The project includes water line, storm drain, lighting, trail, and sidewalk improvements.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Park Blvd. between Country Club Rd. and Parker Rd., Wylie, TX, 75098

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75098 (Wylie)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.