Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Sidewalk Improvements for Alvarado St, 3rd Ave., and 2nd Ave. in Mansfield, TX
Alvarado St, 3rd Ave., and 2nd Ave., Mansfield, TX, 76063
Sidewalk Improvements for Alvarado St, 3rd Ave., and 2nd Ave. is a renovation/alteration project at Alvarado St, 3rd Ave., and 2nd Ave., Mansfield, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Nov 2026. The project has an estimated value of $173K across about 7,060 sq ft.
- Estimated project value
- $173K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 7,060 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $25/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 3 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
5 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
92 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Sidewalk Improvements for Alvarado St, 3rd Ave., and 2nd Ave.
The n/a Roadway Project, filed as Sidewalk Improvements for Alvarado St, 3rd Ave., and 2nd Ave., is a renovation and alteration effort in Mansfield, Texas. The City of Mansfield is the owner of record for this work, which covers 7,060 square feet of concrete sidewalk and leadwalk along with nine curb ramps. The project is registered with TDLR as a public funding initiative involving public land.
Project Scope and Cost
The estimated cost for the n/a Roadway Project is $173,463. This figure is below the median estimated cost of $250,000 for renovation and alteration filings in Tarrant County. The cost per square foot is $25, which is also below the county median of $79 per square foot. The scheduled build window is 92 days, matching the county median for similar projects.
Design and Administration
Teague Nall & Perkins, Inc. is the design firm of record for this project. Mary Rae Davies is the registered accessibility specialist. The project was registered with TDLR in August 2026. Plan review is pending, and completion is targeted for November 2026.
Local Context
The City of Mansfield has six other TDLR-registered projects totaling $14,501,800. These include E Broad Street, Robert and Ann Smith Park, Julian Field Park, Heritage Parkway, and the Service Center Building. Teague Nall & Perkins, Inc. has five other TDLR-registered projects totaling $14,785,490, including work on Elizabeth Lane in Mansfield. The Mansfield area, ZIP code 76063, has a population of about 81,758 and a median household income of $113,177 according to U.S. Census ACS 2023 five-year estimates.
The project status is Project Registered. Construction is scheduled to start in August 2026. The work involves improving accessibility on public streets in Tarrant County. The project utilizes public funds for infrastructure upgrades.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76063 (Mansfield)
One email per change. Unsubscribe in one click. Privacy.
Sidewalk Improvements for Alvarado St, 3rd Ave., and 2nd Ave. is a Renovation/Alteration project located at Alvarado St, 3rd Ave., and 2nd Ave., Mansfield, TX 76063 in Mansfield, Texas. The project has an estimated value of $173K covering 7,060 sq ft. City of Mansfield is the property owner and Teague Nall & Perkins, Inc. is the design firm of record. The project was registered with TDLR on August 12, 2026.
Frequently Asked Questions
What is the total cost of the sidewalk project?
The estimated cost for the n/a Roadway Project on Alvarado Street, 3rd Avenue, and 2nd Avenue is $173,463.
When is the project targeted for completion?
The project is targeted for November 2026, with construction starting in August 2026.
Who is the design firm for this project?
Teague Nall & Perkins, Inc. is the design firm of record for this sidewalk improvement project.
How much square footage will be improved?
The project includes 7,060 square feet of concrete sidewalk and leadwalk, plus nine curb ramps.
What is Sidewalk Improvements for Alvarado St, 3rd Ave., and 2nd Ave.?
Sidewalk Improvements for Alvarado St, 3rd Ave., and 2nd Ave. is a renovation/alteration project at Alvarado St, 3rd Ave., and 2nd Ave. in Mansfield, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 7,060 SF of Concrete sidewalk and leadwalk, 9 BFR's.
Is Sidewalk Improvements for Alvarado St, 3rd Ave., and 2nd Ave. open in Mansfield?
Sidewalk Improvements for Alvarado St, 3rd Ave., and 2nd Ave. is still under construction in Mansfield, TX, with an estimated completion of Nov 2026 according to its TDLR registration.
Where is Sidewalk Improvements for Alvarado St, 3rd Ave., and 2nd Ave. located?
Sidewalk Improvements for Alvarado St, 3rd Ave., and 2nd Ave. is located at Alvarado St, 3rd Ave., and 2nd Ave., Mansfield, TX, 76063, in Tarrant County.
Who is the owner or developer of Sidewalk Improvements for Alvarado St, 3rd Ave., and 2nd Ave.?
City of Mansfield is the property owner/developer of record for Sidewalk Improvements for Alvarado St, 3rd Ave., and 2nd Ave., per its TDLR project registration.
Who is the architect or design firm for Sidewalk Improvements for Alvarado St, 3rd Ave., and 2nd Ave.?
Teague Nall & Perkins, Inc. is the design firm of record for Sidewalk Improvements for Alvarado St, 3rd Ave., and 2nd Ave., according to its TDLR filing.
How much does Sidewalk Improvements for Alvarado St, 3rd Ave., and 2nd Ave. cost and how big is it?
Sidewalk Improvements for Alvarado St, 3rd Ave., and 2nd Ave. has an estimated construction value of $173K and approximately 7,060 square feet (about $25/sqft), based on its TDLR filing.
Scope of Work
7,060 SF of Concrete sidewalk and leadwalk, 9 BFR's.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
Alvarado St, 3rd Ave., and 2nd Ave., Mansfield, TX, 76063
Related Projects
Same Owner
$42.3M totalNearby Projects
Within 0.6 miWatch all construction in 76063 (Mansfield)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Mansfield?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.