Project intelligenceTDLR TABS2024010114Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

AVANCE BIOSCIENCE

5500 NORTH WEST CENTRAL DR. SUITE 100, Houston, TX, 77092

Target date passed (Apr 2025)Review Complete

AVANCE BIOSCIENCE is a renovation/alteration project at 5500 NORTH WEST CENTRAL DR. SUITE 100, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Apr 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $1.2M across about 16,912 sq ft.

Estimated project value
$1.2M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
16,912 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$71/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 25, 2024456 days across supplied datesApr 25, 2025

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    88 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    368 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77092 (Houston)

One email per change. Unsubscribe in one click. Privacy.

AVANCE BIOSCIENCE is a Renovation/Alteration project located at 5500 NORTH WEST CENTRAL DR. SUITE 100, Houston, TX 77092 in Houston, Texas. The project has an estimated value of $1.2M covering 16,912 sq ft. AVANCE BIOSCIENCE INC is the property owner and AMC DESIGN is the design firm of record. The project was registered with TDLR on January 25, 2024.

Frequently Asked Questions

What is AVANCE BIOSCIENCE?

AVANCE BIOSCIENCE is a renovation/alteration project at 5500 NORTH WEST CENTRAL DR. SUITE 100 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: LEASE SPACE REMODEL OF EXISTING OFFICE

Is AVANCE BIOSCIENCE open in Houston?

AVANCE BIOSCIENCE was scheduled to finish construction in Apr 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is AVANCE BIOSCIENCE located?

AVANCE BIOSCIENCE is located at 5500 NORTH WEST CENTRAL DR. SUITE 100, Houston, TX, 77092, in Harris County.

Who is the owner or developer of AVANCE BIOSCIENCE?

AVANCE BIOSCIENCE INC is the property owner/developer of record for AVANCE BIOSCIENCE, per its TDLR project registration.

Who is the architect or design firm for AVANCE BIOSCIENCE?

AMC DESIGN is the design firm of record for AVANCE BIOSCIENCE, according to its TDLR filing.

How much does AVANCE BIOSCIENCE cost and how big is it?

AVANCE BIOSCIENCE has an estimated construction value of $1.2M and approximately 16,912 square feet (about $71/sqft), based on its TDLR filing.

Scope of Work

LEASE SPACE REMODEL OF EXISTING OFFICE

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

5500 NORTH WEST CENTRAL DR. SUITE 100, Houston, TX, 77092

Location by street address

Watch all construction in 77092 (Houston)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.