Project intelligenceTDLR TABS2024010317Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Tobias ES Improvements in Kyle, TX

1005 E, Ranch to Market RD 150 811 Barton Springs Road, Suite 900, Kyle, TX, 78704

Construction complete · Aug 2025Project Closed

Tobias ES Improvements is a renovation/alteration project at 1005 E, Ranch to Market RD 150 811 Barton Springs Road, Suite 900, Kyle, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2025). The project has an estimated value of $5.9M across about 36,500 sq ft.

Estimated project value
$5.9M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
36,500 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$162/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 3mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 29, 2024564 days across supplied datesAug 15, 2025

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    119 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    445 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78704 (Kyle)

One email per change. Unsubscribe in one click. Privacy.

Tobias ES Improvements is a Renovation/Alteration project located at 1005 E, Ranch to Market RD 150 811 Barton Springs Road, Suite 900, Kyle, TX 78704 in Kyle, Texas. The project has an estimated value of $5.9M covering 36,500 sq ft. HAYS CISD is the property owner and O' Connell Robertson is the design firm of record. The project was registered with TDLR on January 29, 2024.

Frequently Asked Questions

What is Tobias ES Improvements?

Tobias ES Improvements is a renovation/alteration project at 1005 E, Ranch to Market RD 150 811 Barton Springs Road, Suite 900 in Kyle, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Maintenance asphalt, HVAC unit, Cooler/Freezer replacement and Roof replacement, Fire Alarm

Is Tobias ES Improvements open in Kyle?

Construction on Tobias ES Improvements is complete — TDLR records show the project passed its required accessibility inspection in Aug 2025. The building is finished and very likely open.

Where is Tobias ES Improvements located?

Tobias ES Improvements is located at 1005 E, Ranch to Market RD 150 811 Barton Springs Road, Suite 900, Kyle, TX, 78704, in Hays County.

Who is the owner or developer of Tobias ES Improvements?

HAYS CISD is the property owner/developer of record for Tobias ES Improvements, per its TDLR project registration.

Who is the architect or design firm for Tobias ES Improvements?

O' Connell Robertson is the design firm of record for Tobias ES Improvements, according to its TDLR filing.

How much does Tobias ES Improvements cost and how big is it?

Tobias ES Improvements has an estimated construction value of $5.9M and approximately 36,500 square feet (about $162/sqft), based on its TDLR filing.

Scope of Work

Maintenance asphalt, HVAC unit, Cooler/Freezer replacement and Roof replacement, Fire Alarm

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1005 E, Ranch to Market RD 150 811 Barton Springs Road, Suite 900, Kyle, TX, 78704

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Related City Permits

Building permits found at or near this location

1005 LINCOLN ST

ePlan: Residential Expedited Review - New construction of a 3-Story Single Family Res. [2bed 3bath]. 1005 LINCOLN ST

ActiveElectrical PermitNewOct 2026
View Details
2026-114291 EP
AEI Electric LLC
1005 WILKS AVE

ePlan: Residential Expedited Review - [Smart Housing] New Construction of 2-Story Single Family Res [3bed 2.5bath] with Attached Carport.

ActiveBuilding PermitNewOct 2026
View Details
2026-060861 BP
A Vision General Contractors LLC
1005 ELDER CIR

ePlan: Residential Expedited Review - Addition and Remodel to Existing 2-Story Single Family Res [5 beds 6.5baths].

ActiveMechanical PermitAddition and RemodelSep 2026
View Details
2024-160037 MP
Vertex Mechanical LLC
1005 LINCOLN ST

ePlan: Residential Expedited Review - New construction of a 3-Story Single Family Res. [2bed 3bath]. 1005 LINCOLN ST

ActivePlumbing PermitNewSep 2026
View Details
2026-114291 PP
Loredos Plumbing
1005 EASON ST

Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3 ton two stage horizontal gas with 90% furnace

ActiveMechanical PermitChange OutSep 2026
View Details
2026-112514 MP
Stan's Heating, Air, Plumbing, & Electrical

Watch all construction in 78704 (Kyle)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.