Project intelligenceTDLR TABS2024010328New Construction
Funding type

This project is privately funded, on private land for private use.

Temple, TX

12718 NE H K Dodgen Loop, Temple, TX, 76501

Construction complete · Feb 2025Project Closed

Temple, TX is a new construction project at 12718 NE H K Dodgen Loop, Temple, in Bell County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2025). The project has an estimated value of $230K across about 1,500 sq ft.

Estimated project value
$230K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,500 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$153/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 29, 2024392 days across supplied datesFeb 24, 2025

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    28 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    364 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

📰About Temple, TX

Tesla, Inc. completed a new electrical infrastructure project at 12718 NE H K Dodgen Loop in Temple, Texas. The construction record shows a scope focused on electrical systems for a facility of 1,500 square feet. TDLR closed the project file in February 2025, marking the end of the accessibility review process for this construction.

The project was registered with the Texas Department of Licensing and Regulation in January 2024, with construction starting in February 2024. The estimated cost for the work was $230,000, which calculates to $153 per square foot. This cost is below the county median for similar new construction filings in Bell County, while the per-square-foot rate is close to the local median of $151.

Project Details and Context

GPD Professional Corporation served as the design firm of record for this privately funded development on private land. Jeffrey A Gutknecht was the registered accessibility specialist associated with the filing. The scheduled build window of 364 days is longer than the county median of 242 days for comparable projects.

Tesla, Inc. has six other TDLR-registered projects totaling $950,000, including locations in Austin, Brookshire, and Cotulla. GPD Professional Corporation has worked on six other registered projects totaling $2,253,665, including sites in Wichita Falls, Conroe, and Cypress. The Temple project fits within a broader pattern of infrastructure development by the owner and design firm across the state.

Third-party listings indicate a Tesla Supercharger location in Temple, with a Reddit post mentioning 48 stalls and a YouTube video describing 50 Tesla superchargers. These external references describe charging capabilities, while the TDLR record specifically confirms the completion of the electrical infrastructure construction and the closure of the project file.

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76501 (Temple)

One email per change. Unsubscribe in one click. Privacy.

Temple, TX is a New Construction project located at 12718 NE H K Dodgen Loop, Temple, TX 76501 in Temple, Texas. The project has an estimated value of $230K covering 1,500 sq ft. Tesla, Inc. is the property owner and GPD Professional Corporation is the design firm of record. The project was registered with TDLR on January 29, 2024.

Frequently Asked Questions

Is the Tesla facility in Temple open?

The TDLR record confirms the construction of electrical infrastructure is complete and the project file is closed. Third-party mentions describe Supercharger availability, but the official record only verifies the construction status.

Who designed the Tesla project in Temple?

GPD Professional Corporation is the design firm of record for this project. Jeffrey A Gutknecht served as the registered accessibility specialist.

What was the estimated cost of the construction?

The estimated cost for the electrical infrastructure project was $230,000. This amount is below the median cost for new construction filings in Bell County.

When was the project registered with TDLR?

The project was registered with TDLR in January 2024. Construction began in February 2024, and the file was closed in February 2025.

Is the site in a flood zone?

It is designated as zone X according to the National Flood Hazard Layer.

What is Temple, TX?

Temple, TX is a new construction project at 12718 NE H K Dodgen Loop in Temple, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: electrical infrastructure

Is Temple, TX open in Temple?

Construction on Temple, TX is complete — TDLR records show the project passed its required accessibility inspection in Feb 2025. The building is finished and very likely open.

Where is Temple, TX located?

Temple, TX is located at 12718 NE H K Dodgen Loop, Temple, TX, 76501, in Bell County.

Who is the owner or developer of Temple, TX?

Tesla, Inc. is the property owner/developer of record for Temple, TX, per its TDLR project registration.

Who is the architect or design firm for Temple, TX?

GPD Professional Corporation is the design firm of record for Temple, TX, according to its TDLR filing.

How much does Temple, TX cost and how big is it?

Temple, TX has an estimated construction value of $230K and approximately 1,500 square feet (about $153/sqft), based on its TDLR filing.

Scope of Work

electrical infrastructure

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

12718 NE H K Dodgen Loop, Temple, TX, 76501

Location by street address

Watch all construction in 76501 (Temple)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.