Funding type
This project is privately funded, on private land for private use.
Bridgewater, Phase 2
Intersection of US 287 and Presidential Parkway, Midlothian, TX, 76065
Bridgewater, Phase 2 is a new construction project at Intersection of US 287 and Presidential Parkway, Midlothian, in Ellis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Mar 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $504K across about 60,535 sq ft.
- Estimated project value
- $504K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 60,535 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $8/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 8mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
195 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
593 days after the preceding date shown.
Source: TDLR filing
View source record
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76065 (Midlothian)
One email per change. Unsubscribe in one click. Privacy.
Bridgewater, Phase 2 is a New Construction project located at Intersection of US 287 and Presidential Parkway, Midlothian, TX 76065 in Midlothian, Texas. The project has an estimated value of $504K covering 60,535 sq ft. Knox Street Partners No. 28 LTD is the property owner and LJA Engineering, Inc. is the design firm of record. The project was registered with TDLR on February 2, 2024.
Frequently Asked Questions
What is Bridgewater, Phase 2?
Bridgewater, Phase 2 is a new construction project at Intersection of US 287 and Presidential Parkway in Midlothian, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 60,535 SF of paving
Is Bridgewater, Phase 2 open in Midlothian?
Bridgewater, Phase 2 was scheduled to finish construction in Mar 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Bridgewater, Phase 2 located?
Bridgewater, Phase 2 is located at Intersection of US 287 and Presidential Parkway, Midlothian, TX, 76065, in Ellis County.
Who is the owner or developer of Bridgewater, Phase 2?
Knox Street Partners No. 28 LTD is the property owner/developer of record for Bridgewater, Phase 2, per its TDLR project registration.
Who is the architect or design firm for Bridgewater, Phase 2?
LJA Engineering, Inc. is the design firm of record for Bridgewater, Phase 2, according to its TDLR filing.
How much does Bridgewater, Phase 2 cost and how big is it?
Bridgewater, Phase 2 has an estimated construction value of $504K and approximately 60,535 square feet (about $8/sqft), based on its TDLR filing.
Scope of Work
60,535 SF of paving
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
Intersection of US 287 and Presidential Parkway, Midlothian, TX, 76065
Related Projects
Watch all construction in 76065 (Midlothian)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Midlothian?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.