Project intelligenceTDLR TABS2024011547New Construction
Funding type

This project is privately funded, on private land for private use.

Tesla

506 I-20, Terrell, TX, 75160

Target date passed (Mar 2025)Review Complete

Tesla is a new construction project at 506 I-20, Terrell, in Kaufman County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Mar 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $182K across about 1,800 sq ft.

Estimated project value
$182K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,800 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$101/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 14, 2024387 days across supplied datesMar 7, 2025

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    19 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    368 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75160 (Terrell)

One email per change. Unsubscribe in one click. Privacy.

Tesla is a New Construction project located at 506 I-20, Terrell, TX 75160 in Terrell, Texas. The project has an estimated value of $182K covering 1,800 sq ft. Tesla, Inc. is the property owner and GPD Professional Corporation is the design firm of record. The project was registered with TDLR on February 14, 2024.

Frequently Asked Questions

What is Tesla?

Tesla is a new construction project at 506 I-20 in Terrell, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: electrical infrastructure

Is Tesla open in Terrell?

Tesla was scheduled to finish construction in Mar 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Tesla located?

Tesla is located at 506 I-20, Terrell, TX, 75160, in Kaufman County.

Who is the owner or developer of Tesla?

Tesla, Inc. is the property owner/developer of record for Tesla, per its TDLR project registration.

Who is the architect or design firm for Tesla?

GPD Professional Corporation is the design firm of record for Tesla, according to its TDLR filing.

How much does Tesla cost and how big is it?

Tesla has an estimated construction value of $182K and approximately 1,800 square feet (about $101/sqft), based on its TDLR filing.

Scope of Work

electrical infrastructure

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

506 I-20, Terrell, TX, 75160

32.71675, -96.32122

Watch all construction in 75160 (Terrell)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.