Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Peoples Street at Mesquite Drainage Improvement in Corpus Christi, TX
Peoples Street at Mesquite, Corpus Christi, TX, 78401
Peoples Street at Mesquite Drainage Improvement is a new construction project at Peoples Street at Mesquite, Corpus Christi, in Nueces County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jul 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $108K across about 1,602 sq ft.
- Estimated project value
- $108K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 1,602 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $67/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 4mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
20 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
470 days after the preceding date shown.
Source: TDLR filing
View source record
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78401 (Corpus Christi)
One email per change. Unsubscribe in one click. Privacy.
Peoples Street at Mesquite Drainage Improvement is a New Construction project located at Peoples Street at Mesquite, Corpus Christi, TX 78401 in Corpus Christi, Texas. The project has an estimated value of $108K covering 1,602 sq ft. City of Corpus Christi is the property owner. The project was registered with TDLR on February 27, 2024.
Frequently Asked Questions
What is Peoples Street at Mesquite Drainage Improvement?
Peoples Street at Mesquite Drainage Improvement is a new construction project at Peoples Street at Mesquite in Corpus Christi, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: sidewalk and drainage improvements
Is Peoples Street at Mesquite Drainage Improvement open in Corpus Christi?
Peoples Street at Mesquite Drainage Improvement was scheduled to finish construction in Jul 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Peoples Street at Mesquite Drainage Improvement located?
Peoples Street at Mesquite Drainage Improvement is located at Peoples Street at Mesquite, Corpus Christi, TX, 78401, in Nueces County.
Who is the owner or developer of Peoples Street at Mesquite Drainage Improvement?
City of Corpus Christi is the property owner/developer of record for Peoples Street at Mesquite Drainage Improvement, per its TDLR project registration.
How much does Peoples Street at Mesquite Drainage Improvement cost and how big is it?
Peoples Street at Mesquite Drainage Improvement has an estimated construction value of $108K and approximately 1,602 square feet (about $67/sqft), based on its TDLR filing.
Scope of Work
sidewalk and drainage improvements
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
Peoples Street at Mesquite, Corpus Christi, TX, 78401
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$912.4M totalWatch all construction in 78401 (Corpus Christi)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Corpus Christi?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.