Project intelligenceTDLR TABS2024013295Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

3rd Street and Maple Street Paving and Drainage Improvements in Frisco, TX

9400 3rd Street, Frisco, TX, 75033

Construction complete · Jan 2025Project Closed

3rd Street and Maple Street Paving and Drainage Improvements is a renovation/alteration project at 9400 3rd Street, Frisco, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2025). The project has an estimated value of $844K across about 349 sq ft.

Estimated project value
$844K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
349 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$2.42K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
9 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 7, 2024330 days across supplied datesJan 31, 2025

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    57 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    273 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75033 (Frisco)

One email per change. Unsubscribe in one click. Privacy.

3rd Street and Maple Street Paving and Drainage Improvements is a Renovation/Alteration project located at 9400 3rd Street, Frisco, TX 75033 in Frisco, Texas. The project has an estimated value of $844K covering 349 sq ft. City of Frisco is the property owner and Quiddity Engineering, LLC is the design firm of record. The project was registered with TDLR on March 7, 2024.

Frequently Asked Questions

What is 3rd Street and Maple Street Paving and Drainage Improvements?

3rd Street and Maple Street Paving and Drainage Improvements is a renovation/alteration project at 9400 3rd Street in Frisco, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Reconstruction of 349 feet of 3rd Street and Maple Street including sidewalks adjacent to the back of curb.

Is 3rd Street and Maple Street Paving and Drainage Improvements open in Frisco?

Construction on 3rd Street and Maple Street Paving and Drainage Improvements is complete — TDLR records show the project passed its required accessibility inspection in Jan 2025. The building is finished and very likely open.

Where is 3rd Street and Maple Street Paving and Drainage Improvements located?

3rd Street and Maple Street Paving and Drainage Improvements is located at 9400 3rd Street, Frisco, TX, 75033, in Collin County.

Who is the owner or developer of 3rd Street and Maple Street Paving and Drainage Improvements?

City of Frisco is the property owner/developer of record for 3rd Street and Maple Street Paving and Drainage Improvements, per its TDLR project registration.

Who is the architect or design firm for 3rd Street and Maple Street Paving and Drainage Improvements?

Quiddity Engineering, LLC is the design firm of record for 3rd Street and Maple Street Paving and Drainage Improvements, according to its TDLR filing.

How much does 3rd Street and Maple Street Paving and Drainage Improvements cost and how big is it?

3rd Street and Maple Street Paving and Drainage Improvements has an estimated construction value of $844K and approximately 349 square feet (about $2.42K/sqft), based on its TDLR filing.

Scope of Work

Reconstruction of 349 feet of 3rd Street and Maple Street including sidewalks adjacent to the back of curb.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

9400 3rd Street, Frisco, TX, 75033

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75033 (Frisco)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.