Project intelligenceTDLR TABS2025000536Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

City of The Colony Phase 14A Street Reconstruction

King Street, Knox Street, Norris Street, The Colony, TX, 75056

Target date passed (Sep 2026)Review Complete

City of The Colony Phase 14A Street Reconstruction is a renovation/alteration project at King Street, Knox Street, Norris Street, The Colony, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Sep 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $4.7M across about 51,000 sq ft.

Estimated project value
$4.7M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
51,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$92/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 11mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Sep 10, 2024721 days across supplied datesSep 1, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    21 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    700 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75056 (The Colony)

One email per change. Unsubscribe in one click. Privacy.

City of The Colony Phase 14A Street Reconstruction is a Renovation/Alteration project located at King Street, Knox Street, Norris Street, The Colony, TX 75056 in The Colony, Texas. The project has an estimated value of $4.7M covering 51,000 sq ft. City of The Colony is the property owner and Quiddity Engineering, LLC is the design firm of record. The project was registered with TDLR on September 10, 2024.

Frequently Asked Questions

What is City of The Colony Phase 14A Street Reconstruction?

City of The Colony Phase 14A Street Reconstruction is a renovation/alteration project at King Street, Knox Street, Norris Street in The Colony, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Reconstruction of road, sidewalk and utilities on Knox Street and Norris Street from Miller Drive to Paige Road and King Drive from Ramsey Drive to Gibson Drive, in The Colony, Texas.

Is City of The Colony Phase 14A Street Reconstruction open in The Colony?

City of The Colony Phase 14A Street Reconstruction was scheduled to finish construction in Sep 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is City of The Colony Phase 14A Street Reconstruction located?

City of The Colony Phase 14A Street Reconstruction is located at King Street, Knox Street, Norris Street, The Colony, TX, 75056, in Denton County.

Who is the owner or developer of City of The Colony Phase 14A Street Reconstruction?

City of The Colony is the property owner/developer of record for City of The Colony Phase 14A Street Reconstruction, per its TDLR project registration.

Who is the architect or design firm for City of The Colony Phase 14A Street Reconstruction?

Quiddity Engineering, LLC is the design firm of record for City of The Colony Phase 14A Street Reconstruction, according to its TDLR filing.

How much does City of The Colony Phase 14A Street Reconstruction cost and how big is it?

City of The Colony Phase 14A Street Reconstruction has an estimated construction value of $4.7M and approximately 51,000 square feet (about $92/sqft), based on its TDLR filing.

Scope of Work

Reconstruction of road, sidewalk and utilities on Knox Street and Norris Street from Miller Drive to Paige Road and King Drive from Ramsey Drive to Gibson Drive, in The Colony, Texas.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

King Street, Knox Street, Norris Street, The Colony, TX, 75056

Location by street address

Watch all construction in 75056 (The Colony)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in The Colony?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.